← New optimization 📋 History
📥 Export (.xlsx)

Optimization Results #2 from history

329 periods (164.5h)

Site ConfigurationBESS + Generation + Demand
Grid AccessFull Grid Access
Objective๐Ÿ“ˆ Maximize Profit
SolverMILP (HiGHS)
Time HorizonIntraday, Day Ahead, Week Ahead
Scenarios3 price scenarios
Commit Window82.0h
TimezoneEurope/Bucharest
Validation✓ No simultaneous chg/dis
Without Batteryโ“˜
€59,963
With Batteryโ“˜
€168,194
=
Battery Earns Youโ“˜
โ–ฒ €108,231 (180.5%)
๐Ÿ“Š Results Explained

The optimizer found a profitable dispatch schedule generating โ‚ฌ168,194.01 in net revenue across 329 periods (164.5h). This was achieved using a BESS + Generation + Demand configuration with Full Grid Access, optimizing for Maximize Profit.

Compared to operating without the battery, this schedule delivers โ‚ฌ108,230.82 in savings (180.5%). This is the direct financial value the BESS adds to the project.

Method comparison: 5 optimization methods were tested. MILP (HiGHS) achieved the highest revenue at โ‚ฌ168,194.01, while Rule-Based (Benchmark) returned โ‚ฌ118,197.03 โ€” a gap of โ‚ฌ49,996.98.

Mathematical optimization (MILP) outperformed the naive rule-based strategy by โ‚ฌ49,996.98. This demonstrates the concrete financial value of using optimization over simple threshold-based dispatch.

Method Comparisonโ“˜

MethodCategoryNet Revenuevs BestSolve TimeStatus
MILP (HiGHS)โ“˜ exact €168,194 ๐Ÿ† Best 0.09s โœ“
Model Predictive Controlโ“˜ exact €166,540 -1.0% 0.55s โœ“
Dynamic Programmingโ“˜ exact €144,134 -14.3% 0.62s โœ“
Robust Optimizationโ“˜ robust €127,640 -24.1% 0.1s โœ“
Rule-Based (Benchmark)โ“˜ benchmark €118,197 -29.7% 0.0025s โœ“

Scenario Analysisโ“˜ Showing: MILP (HiGHS)

Revenue Confidence Band
€156,502
Worst Case
€168,194
Base Case (60%)
€179,886
Best Case
Scenario Net Result Export Rev Ancillary DR Savings Import Cost Degradation Weight
โ–ฒ Best Case €179,886 +€153,402 +€34,919 +€7,361 −€9,800 −€5,996 20%
โ—† Base Case €168,194 +€137,226 +€34,919 +€6,521 −€4,475 −€5,996 60%
โ–ผ Worst Case €156,502 +€121,049 +€34,919 +€5,680 +€850 −€5,996 20%

Revenue BreakdownShowing: MILP (HiGHS)

How the €168,194 "With Battery" result breaks down

Export Revenue
+€137,226
Ancillary (FCR+FFR)
+€34,919
DR Savings
+€6,521
Grid Import Cost
−€4,475
Degradation
−€5,996
Net Result
Revenue
€168,194

Scheduling Horizons

Intraday
Today 03:04โ†’23:59
€20,921
Net Result
41
Periods
€15,384
Savings (277.8%)
27.5 MW
Peak Import
Day Ahead
Tomorrow 2026-02-16
€23,399
Net Result
48
Periods
€16,127
Savings (221.8%)
29.2 MW
Peak Import
Week Ahead
2026-02-15โ†’2026-02-22
€168,194
Net Result
329
Periods
€108,231
Savings (180.5%)
29.2 MW
Peak Import

Charts

๐Ÿ”‹ Battery PerformanceMILP (HiGHS)
Battery Impactโ“˜ โ–ฒ โ‚ฌ108,231
Trading P&Lโ“˜ โ‚ฌ63,863
Degradationโ“˜ โˆ’โ‚ฌ5,996
Avg Spreadโ“˜ โ‚ฌ60.56/MWh
Buy / Sellโ“˜ โ‚ฌ8 / โ‚ฌ68
Charged / Dischargedโ“˜ 1092.8 / 972.3 MWh
Eq. Cyclesโ“˜ 8.6
Throughputโ“˜ 2065.1 MWh
Cycle Depthโ“˜ 70.0%
Active Timeโ“˜ 51.1%
Chg / Dis Hoursโ“˜ 39.5h / 44.5h
Idle / Offlineโ“˜ 75.5h / 5.0h
SOH / Tempโ“˜ 96.5% / 22.4ยฐC
โšก Grid & Demand Response
Export Revenueโ“˜ +โ‚ฌ137,226
Import Costโ“˜ โˆ’โ‚ฌ4,475
DR Savingsโ“˜ โ‚ฌ6,521
Peak Import / Exportโ“˜ 29.2 / 47.1 MW
Gen. Deratedโ“˜ 11 periods
DR Activatedโ“˜ 192p (236.9 MWh)
๐Ÿ“ก Ancillary Services
Total Ancillaryโ“˜ +โ‚ฌ34,919
FCR Revenueโ“˜ +โ‚ฌ23,651
FFR Revenueโ“˜ +โ‚ฌ11,267
FCR Committedโ“˜ 206p (103.0h)
FFR Committedโ“˜ 179p (89.5h)
Avg MWโ“˜ FCR 8.9 / FFR 7.6
Avg Priceโ“˜ โ‚ฌ16 / 9/MWยทh
Capacity Alloc.โ“˜ 54.7%
⚡ Grid Constraints & Network Charges
Capacity Chargeโ“˜€15.0/MW/mo
Import Limitโ“˜200.0 MW
Export Limitโ“˜200.0 MW
Buy Price Rangeโ“˜€-12.71 — 111.14/MWh
Sell Price Rangeโ“˜€0.0 — 111.14/MWh
🔧 Input Parameters (from file)
Battery Capacity120.0 MWh
Max Charge30.0 MW
Max Discharge30.0 MW
Roundtrip Efficiency88% (piecewise-linear)
Soc Range10% โ€“ 90%
Initial Soc25%
Degradation Costโ‚ฌ2.5/MWh (cycle + calendar)
Self Discharge0.1%/day
Ramp RateUnlimited
Warranty CyclesUnlimited
Warranty ThroughputUnlimited
Risk ToleranceOff
Market TypeSingle wholesale
Solar0.0 MW
Wind25.0 MW

Detailed ResultsShowing: MILP (HiGHS)

CHARGE 2026-02-15T03:30 → 2026-02-15T04:30 1.5h · 3p €-496
Charged
37.5 MWh
Grid Import
31.39 MWh
Avg Price
€19/MWh
SOC
31.1% → 55.4%
Charge 15.0 MW from grid @ โ‚ฌ32/MWh
IDLE 2026-02-15T05:00 → 2026-02-15T05:30 1.0h · 2p €433
Grid Export
2.96 MWh
Avg Price
€33/MWh
SOC
55.4% → 55.4%
Export 1.9 MW surplus
CHARGE 2026-02-15T06:00 → 2026-02-15T06:00 0.5h · 1p €-360
Charged
15.0 MWh
Grid Import
11.85 MWh
Curtailed
1.15 MWh
Avg Price
€28/MWh
SOC
67.5% → 67.5%
Charge 30.0 MW from grid @ โ‚ฌ28/MWh | Curtail 2.3 MW demand
IDLE 2026-02-15T06:30 → 2026-02-15T06:30 0.5h · 1p €283
Grid Export
2.96 MWh
Curtailed
1.25 MWh
Avg Price
€35/MWh
SOC
67.5% → 67.5%
Curtail 2.5 MW demand | Export 5.9 MW surplus
CHARGE 2026-02-15T07:00 → 2026-02-15T07:00 0.5h · 1p €-299
Charged
13.63 MWh
Grid Import
9.76 MWh
Curtailed
1.2 MWh
Avg Price
€30/MWh
SOC
78.5% → 78.5%
Charge 27.3 MW from grid @ โ‚ฌ30/MWh | Curtail 2.4 MW demand
IDLE 2026-02-15T07:30 → 2026-02-15T07:30 0.5h · 1p €435
Grid Export
3.09 MWh
Curtailed
1.25 MWh
Avg Price
€47/MWh
SOC
78.5% → 78.5%
Curtail 2.5 MW demand | Export 6.2 MW surplus
DISCHARGE 2026-02-15T08:00 → 2026-02-15T10:30 3.0h · 6p €5,395
Discharged
62.08 MWh
Grid Export
80.39 MWh
Curtailed
7.5 MWh
Avg Price
€60/MWh
SOC
64.7% → 21.5%
Discharge 30.0 MW to grid @ โ‚ฌ67/MWh | Curtail 2.5 MW demand
IDLE 2026-02-15T11:00 → 2026-02-15T11:00 0.5h · 1p €450
Grid Export
4.35 MWh
Curtailed
1.25 MWh
Avg Price
€48/MWh
SOC
21.5% → 21.5%
Curtail 2.5 MW demand | Export 8.7 MW surplus
DISCHARGE 2026-02-15T11:30 → 2026-02-15T11:30 0.5h · 1p €592
Discharged
7.12 MWh
Grid Export
12.15 MWh
Curtailed
1.25 MWh
Avg Price
€43/MWh
SOC
15.0% → 15.0%
Discharge 14.2 MW to grid @ โ‚ฌ43/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-15T12:00 → 2026-02-15T14:30 3.0h · 6p €258
Charged
86.59 MWh
Grid Import
64.66 MWh
Avg Price
€-6/MWh
SOC
24.4% → 85.0%
Charge 23.2 MW from grid @ โ‚ฌ-3/MWh
DISCHARGE 2026-02-15T15:00 → 2026-02-15T15:00 0.5h · 1p €854
Discharged
4.0 MWh
Grid Export
9.64 MWh
Curtailed
1.25 MWh
Avg Price
€51/MWh
SOC
81.4% → 81.4%
Discharge 8.0 MW to grid @ โ‚ฌ51/MWh | Curtail 2.5 MW demand
IDLE 2026-02-15T15:30 → 2026-02-15T15:30 0.5h · 1p €404
Grid Export
6.5 MWh
Curtailed
1.25 MWh
Avg Price
€38/MWh
SOC
81.4% → 81.4%
Curtail 2.5 MW demand | Export 13.0 MW surplus
DISCHARGE 2026-02-15T16:00 → 2026-02-15T16:00 0.5h · 1p €954
Discharged
4.95 MWh
Grid Export
11.11 MWh
Curtailed
1.25 MWh
Avg Price
€64/MWh
SOC
76.9% → 76.9%
Discharge 9.9 MW to grid @ โ‚ฌ64/MWh | Curtail 2.5 MW demand
IDLE 2026-02-15T16:30 → 2026-02-15T17:30 1.5h · 3p €1,531
Grid Export
17.14 MWh
Curtailed
3.75 MWh
Avg Price
€52/MWh
SOC
76.9% → 76.9%
Curtail 2.5 MW demand | Export 11.6 MW surplus
DISCHARGE 2026-02-15T18:00 → 2026-02-15T19:30 2.0h · 4p €7,280
Discharged
60.0 MWh
Grid Export
77.25 MWh
Curtailed
4.95 MWh
Avg Price
€93/MWh
SOC
63.0% → 21.5%
Discharge 30.0 MW to grid @ โ‚ฌ94/MWh | Curtail 2.5 MW demand
IDLE 2026-02-15T20:00 → 2026-02-15T22:00 2.5h · 5p €2,267
Grid Export
22.41 MWh
Curtailed
6.1 MWh
Avg Price
€47/MWh
SOC
21.5% → 21.5%
Curtail 2.4 MW demand | Export 8.6 MW surplus
CHARGE 2026-02-15T22:30 → 2026-02-15T23:00 1.0h · 2p €-579
Charged
30.0 MWh
Grid Import
23.68 MWh
Avg Price
€21/MWh
SOC
33.6% → 45.7%
Charge 30.0 MW from grid @ โ‚ฌ18/MWh
IDLE 2026-02-15T23:30 → 2026-02-16T01:30 2.5h · 5p €1,612
Grid Export
18.32 MWh
Avg Price
€35/MWh
SOC
45.7% → 45.7%
Export 7.3 MW surplus
CHARGE 2026-02-16T02:00 → 2026-02-16T02:00 0.5h · 1p €-319
Charged
15.0 MWh
Grid Import
10.97 MWh
Avg Price
€25/MWh
SOC
57.8% → 57.8%
Charge 30.0 MW from grid @ โ‚ฌ25/MWh
IDLE 2026-02-16T02:30 → 2026-02-16T02:30 0.5h · 1p €243
Grid Export
4.88 MWh
Avg Price
€27/MWh
SOC
57.8% → 57.8%
Export 9.7 MW surplus
CHARGE 2026-02-16T03:00 → 2026-02-16T03:30 1.0h · 2p €-475
Charged
25.44 MWh
Grid Import
17.29 MWh
Avg Price
€26/MWh
SOC
66.3% → 78.5%
Charge 20.9 MW from grid @ โ‚ฌ26/MWh
IDLE 2026-02-16T04:00 → 2026-02-16T07:00 3.5h · 7p €2,262
Grid Export
34.3 MWh
Curtailed
3.65 MWh
Avg Price
€34/MWh
SOC
78.5% → 78.5%
Export 7.5 MW surplus
DISCHARGE 2026-02-16T07:30 → 2026-02-16T09:30 2.5h · 5p €5,010
Discharged
61.92 MWh
Grid Export
88.35 MWh
Curtailed
6.25 MWh
Avg Price
€54/MWh
SOC
72.1% → 21.5%
Discharge 14.0 MW to grid @ โ‚ฌ49/MWh | Curtail 2.5 MW demand
IDLE 2026-02-16T10:00 → 2026-02-16T11:00 1.5h · 3p €1,307
Grid Export
13.4 MWh
Curtailed
3.75 MWh
Avg Price
€40/MWh
SOC
21.5% → 21.5%
Curtail 2.5 MW demand | Export 8.1 MW surplus
DISCHARGE 2026-02-16T11:30 → 2026-02-16T11:30 0.5h · 1p €546
Discharged
7.12 MWh
Grid Export
11.48 MWh
Curtailed
1.25 MWh
Avg Price
€42/MWh
SOC
15.0% → 15.0%
Discharge 14.2 MW to grid @ โ‚ฌ42/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-16T12:00 → 2026-02-16T14:30 3.0h · 6p €129
Charged
86.51 MWh
Grid Import
76.39 MWh
Curtailed
1.25 MWh
Avg Price
€-3/MWh
SOC
24.4% → 85.0%
Charge 23.0 MW from grid @ โ‚ฌ-2/MWh
DISCHARGE 2026-02-16T15:00 → 2026-02-16T15:30 1.0h · 2p €1,270
Discharged
8.88 MWh
Grid Export
12.43 MWh
Curtailed
2.5 MWh
Avg Price
€57/MWh
SOC
81.7% → 77.0%
Discharge 7.3 MW to grid @ โ‚ฌ51/MWh | Curtail 2.5 MW demand
IDLE 2026-02-16T16:00 → 2026-02-16T17:30 2.0h · 4p €1,527
Grid Export
14.27 MWh
Curtailed
4.9 MWh
Avg Price
€53/MWh
SOC
77.0% → 76.9%
Curtail 2.5 MW demand | Export 5.4 MW surplus
DISCHARGE 2026-02-16T18:00 → 2026-02-16T19:30 2.0h · 4p €7,931
Discharged
60.0 MWh
Grid Export
76.78 MWh
Curtailed
4.9 MWh
Avg Price
€102/MWh
SOC
63.1% → 21.5%
Discharge 30.0 MW to grid @ โ‚ฌ107/MWh | Curtail 2.5 MW demand
IDLE 2026-02-16T20:00 → 2026-02-16T23:30 4.0h · 8p €3,649
Grid Export
40.08 MWh
Curtailed
6.1 MWh
Avg Price
€44/MWh
SOC
21.5% → 21.5%
Curtail 2.5 MW demand | Export 8.1 MW surplus
CHARGE 2026-02-17T00:00 → 2026-02-17T00:00 0.5h · 1p €-240
Charged
15.0 MWh
Grid Import
9.64 MWh
Avg Price
€20/MWh
SOC
33.6% → 33.6%
Charge 30.0 MW from grid @ โ‚ฌ20/MWh
IDLE 2026-02-17T00:30 → 2026-02-17T00:30 0.5h · 1p €339
Grid Export
5.84 MWh
Avg Price
€29/MWh
SOC
33.6% → 33.6%
Export 11.7 MW surplus
CHARGE 2026-02-17T01:00 → 2026-02-17T01:00 0.5h · 1p €-137
Charged
15.0 MWh
Grid Import
9.62 MWh
Avg Price
€10/MWh
SOC
45.7% → 45.7%
Charge 30.0 MW from grid @ โ‚ฌ10/MWh
IDLE 2026-02-17T01:30 → 2026-02-17T01:30 0.5h · 1p €319
Grid Export
4.43 MWh
Avg Price
€26/MWh
SOC
45.7% → 45.7%
Export 8.9 MW surplus
CHARGE 2026-02-17T02:00 → 2026-02-17T03:00 1.5h · 3p €-603
Charged
40.45 MWh
Grid Import
26.45 MWh
Avg Price
€21/MWh
SOC
54.3% → 78.5%
Charge 20.9 MW from grid @ โ‚ฌ25/MWh
IDLE 2026-02-17T03:30 → 2026-02-17T07:00 4.0h · 8p €2,505
Grid Export
38.93 MWh
Curtailed
3.55 MWh
Avg Price
€33/MWh
SOC
78.5% → 78.5%
Export 11.1 MW surplus
DISCHARGE 2026-02-17T07:30 → 2026-02-17T08:00 1.0h · 2p €2,315
Discharged
30.0 MWh
Grid Export
41.02 MWh
Curtailed
2.4 MWh
Avg Price
€57/MWh
SOC
64.6% → 50.8%
Discharge 30.0 MW to grid @ โ‚ฌ59/MWh | Curtail 2.4 MW demand
IDLE 2026-02-17T08:30 → 2026-02-17T09:00 1.0h · 2p €870
Grid Export
11.21 MWh
Curtailed
2.5 MWh
Avg Price
€44/MWh
SOC
50.8% → 50.8%
Curtail 2.5 MW demand | Export 11.1 MW surplus
DISCHARGE 2026-02-17T09:30 → 2026-02-17T10:30 1.5h · 3p €2,733
Discharged
31.91 MWh
Grid Export
47.83 MWh
Curtailed
3.75 MWh
Avg Price
€52/MWh
SOC
41.7% → 21.5%
Discharge 19.8 MW to grid @ โ‚ฌ52/MWh | Curtail 2.5 MW demand
IDLE 2026-02-17T11:00 → 2026-02-17T11:00 0.5h · 1p €504
Grid Export
5.92 MWh
Curtailed
1.25 MWh
Avg Price
€43/MWh
SOC
21.5% → 21.5%
Curtail 2.5 MW demand | Export 11.8 MW surplus
DISCHARGE 2026-02-17T11:30 → 2026-02-17T11:30 0.5h · 1p €563
Discharged
7.12 MWh
Grid Export
13.04 MWh
Curtailed
1.25 MWh
Avg Price
€39/MWh
SOC
15.0% → 15.0%
Discharge 14.2 MW to grid @ โ‚ฌ39/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-17T12:00 → 2026-02-17T14:30 3.0h · 6p €18
Charged
86.51 MWh
Grid Import
60.95 MWh
Avg Price
€-3/MWh
SOC
24.4% → 85.0%
Charge 23.0 MW from grid @ โ‚ฌ-1/MWh
DISCHARGE 2026-02-17T15:00 → 2026-02-17T15:00 0.5h · 1p €954
Discharged
7.12 MWh
Grid Export
11.88 MWh
Curtailed
1.25 MWh
Avg Price
€54/MWh
SOC
78.5% → 78.5%
Discharge 14.2 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand
IDLE 2026-02-17T15:30 → 2026-02-17T16:00 1.0h · 2p €876
Grid Export
10.37 MWh
Curtailed
2.5 MWh
Avg Price
€51/MWh
SOC
78.5% → 78.5%
Curtail 2.5 MW demand | Export 10.2 MW surplus
DISCHARGE 2026-02-17T16:30 → 2026-02-17T16:30 0.5h · 1p €878
Discharged
6.33 MWh
Grid Export
11.38 MWh
Curtailed
1.25 MWh
Avg Price
€62/MWh
SOC
72.8% → 72.8%
Discharge 12.7 MW to grid @ โ‚ฌ62/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-17T17:00 → 2026-02-17T17:00 0.5h · 1p €-294
Charged
13.59 MWh
Grid Import
8.12 MWh
Curtailed
1.25 MWh
Avg Price
€38/MWh
SOC
83.8% → 83.8%
Charge 27.2 MW from grid @ โ‚ฌ38/MWh | Curtail 2.5 MW demand
DISCHARGE 2026-02-17T17:30 → 2026-02-17T19:30 2.5h · 5p €9,191
Discharged
67.5 MWh
Grid Export
94.65 MWh
Curtailed
6.2 MWh
Avg Price
€92/MWh
SOC
76.9% → 21.5%
Discharge 15.0 MW to grid @ โ‚ฌ75/MWh | Curtail 2.5 MW demand
IDLE 2026-02-17T20:00 → 2026-02-17T23:30 4.0h · 8p €3,758
Grid Export
50.95 MWh
Curtailed
6.15 MWh
Avg Price
€41/MWh
SOC
21.5% → 21.5%
Curtail 2.5 MW demand | Export 13.1 MW surplus
CHARGE 2026-02-18T00:00 → 2026-02-18T00:00 0.5h · 1p €-249
Charged
15.0 MWh
Grid Import
8.87 MWh
Avg Price
€23/MWh
SOC
33.6% → 33.6%
Charge 30.0 MW from grid @ โ‚ฌ23/MWh
IDLE 2026-02-18T00:30 → 2026-02-18T01:00 1.0h · 2p €684
Grid Export
12.63 MWh
Avg Price
€31/MWh
SOC
33.6% → 33.6%
Export 12.8 MW surplus
CHARGE 2026-02-18T01:30 → 2026-02-18T02:00 1.0h · 2p €-137
Charged
22.5 MWh
Grid Import
8.88 MWh
Avg Price
€22/MWh
SOC
39.8% → 51.9%
Charge 15.0 MW from renewables @ โ‚ฌ23/MWh
IDLE 2026-02-18T02:30 → 2026-02-18T03:30 1.5h · 3p €1,042
Grid Export
20.35 MWh
Avg Price
€30/MWh
SOC
51.9% → 51.9%
Export 13.6 MW surplus
CHARGE 2026-02-18T04:00 → 2026-02-18T05:00 1.5h · 3p €-153
Charged
32.73 MWh
Grid Import
14.02 MWh
Avg Price
€19/MWh
SOC
60.2% → 78.5%
Charge 20.4 MW from grid @ โ‚ฌ20/MWh
IDLE 2026-02-18T05:30 → 2026-02-18T07:30 2.5h · 5p €2,097
Grid Export
31.68 MWh
Curtailed
4.9 MWh
Avg Price
€38/MWh
SOC
78.5% → 78.5%
Export 10.6 MW surplus
DISCHARGE 2026-02-18T08:00 → 2026-02-18T10:00 2.5h · 5p €4,957
Discharged
54.13 MWh
Grid Export
91.26 MWh
Curtailed
6.15 MWh
Avg Price
€51/MWh
SOC
69.5% → 28.9%
Discharge 19.8 MW to grid @ โ‚ฌ53/MWh | Curtail 2.5 MW demand
IDLE 2026-02-18T10:30 → 2026-02-18T10:30 0.5h · 1p €513
Grid Export
7.54 MWh
Curtailed
1.2 MWh
Avg Price
€41/MWh
SOC
28.9% → 28.9%
Curtail 2.4 MW demand | Export 15.1 MW surplus
DISCHARGE 2026-02-18T11:00 → 2026-02-18T11:00 0.5h · 1p €1,261
Discharged
15.0 MWh
Grid Export
22.89 MWh
Curtailed
1.2 MWh
Avg Price
€56/MWh
SOC
15.0% → 15.0%
Discharge 30.0 MW to grid @ โ‚ฌ56/MWh | Curtail 2.4 MW demand
IDLE 2026-02-18T11:30 → 2026-02-18T11:30 0.5h · 1p €466
Grid Export
8.51 MWh
Curtailed
1.25 MWh
Avg Price
€43/MWh
SOC
15.0% → 15.0%
Curtail 2.5 MW demand | Export 17.0 MW surplus
CHARGE 2026-02-18T12:00 → 2026-02-18T14:30 3.0h · 6p €109
Charged
86.41 MWh
Grid Import
43.19 MWh
Curtailed
1.25 MWh
Avg Price
€-5/MWh
SOC
24.3% → 85.0%
Charge 22.8 MW from grid @ โ‚ฌ-7/MWh
DISCHARGE 2026-02-18T15:00 → 2026-02-18T15:00 0.5h · 1p €1,007
Discharged
7.12 MWh
Grid Export
14.75 MWh
Curtailed
1.2 MWh
Avg Price
€48/MWh
SOC
78.5% → 78.5%
Discharge 14.2 MW to grid @ โ‚ฌ48/MWh | Curtail 2.4 MW demand
IDLE 2026-02-18T15:30 → 2026-02-18T17:30 2.5h · 5p €2,679
Grid Export
35.04 MWh
Curtailed
6.2 MWh
Avg Price
€48/MWh
SOC
78.5% → 78.5%
Curtail 2.5 MW demand | Export 15.9 MW surplus
DISCHARGE 2026-02-18T18:00 → 2026-02-18T20:00 2.5h · 5p €9,722
Discharged
61.66 MWh
Grid Export
101.5 MWh
Curtailed
6.2 MWh
Avg Price
€89/MWh
SOC
64.6% → 21.5%
Discharge 30.0 MW to grid @ โ‚ฌ101/MWh | Curtail 2.5 MW demand
IDLE 2026-02-18T20:30 → 2026-02-19T00:00 4.0h · 8p €3,608
Grid Export
53.51 MWh
Curtailed
4.85 MWh
Avg Price
€37/MWh
SOC
21.5% → 21.5%
Curtail 2.5 MW demand | Export 15.3 MW surplus
CHARGE 2026-02-19T00:30 → 2026-02-19T01:00 1.0h · 2p €-497
Charged
30.0 MWh
Grid Import
19.82 MWh
Avg Price
€21/MWh
SOC
33.6% → 45.8%
Charge 30.0 MW from grid @ โ‚ฌ18/MWh
IDLE 2026-02-19T01:30 → 2026-02-19T02:30 1.5h · 3p €907
Grid Export
13.91 MWh
Avg Price
€29/MWh
SOC
45.8% → 45.8%
Export 11.0 MW surplus
CHARGE 2026-02-19T03:00 → 2026-02-19T03:00 0.5h · 1p €-300
Charged
15.0 MWh
Grid Import
11.35 MWh
Avg Price
€23/MWh
SOC
57.9% → 57.9%
Charge 30.0 MW from grid @ โ‚ฌ23/MWh
IDLE 2026-02-19T03:30 → 2026-02-19T04:30 1.5h · 3p €710
Grid Export
10.32 MWh
Avg Price
€27/MWh
SOC
57.9% → 57.9%
Export 6.6 MW surplus
CHARGE 2026-02-19T05:00 → 2026-02-19T05:00 0.5h · 1p €-239
Charged
15.0 MWh
Grid Import
12.26 MWh
Avg Price
€16/MWh
SOC
70.0% → 70.0%
Charge 30.0 MW from grid @ โ‚ฌ16/MWh
IDLE 2026-02-19T05:30 → 2026-02-19T07:00 2.0h · 4p €1,697
Grid Export
19.32 MWh
Curtailed
3.6 MWh
Avg Price
€38/MWh
SOC
70.0% → 70.0%
Export 6.3 MW surplus
DISCHARGE 2026-02-19T07:30 → 2026-02-19T07:30 0.5h · 1p €1,223
Discharged
15.0 MWh
Grid Export
20.07 MWh
Curtailed
1.25 MWh
Avg Price
€61/MWh
SOC
56.1% → 56.1%
Discharge 30.0 MW to grid @ โ‚ฌ61/MWh | Curtail 2.5 MW demand
IDLE 2026-02-19T08:00 → 2026-02-19T08:00 0.5h · 1p €476
Grid Export
5.06 MWh
Curtailed
1.25 MWh
Avg Price
€43/MWh
SOC
56.1% → 56.1%
Curtail 2.5 MW demand | Export 10.1 MW surplus
DISCHARGE 2026-02-19T08:30 → 2026-02-19T09:30 1.5h · 3p €2,819
Discharged
30.0 MWh
Grid Export
44.17 MWh
Curtailed
3.75 MWh
Avg Price
€57/MWh
SOC
42.3% → 28.6%
Discharge 30.0 MW to grid @ โ‚ฌ65/MWh | Curtail 2.5 MW demand
IDLE 2026-02-19T10:00 → 2026-02-19T11:00 1.5h · 3p €1,281
Grid Export
14.46 MWh
Curtailed
3.7 MWh
Avg Price
€44/MWh
SOC
28.6% → 28.6%
Curtail 2.5 MW demand | Export 10.6 MW surplus
DISCHARGE 2026-02-19T11:30 → 2026-02-19T11:30 0.5h · 1p €1,004
Discharged
14.7 MWh
Grid Export
18.87 MWh
Curtailed
1.25 MWh
Avg Price
€54/MWh
SOC
15.0% → 15.0%
Discharge 29.4 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-19T12:00 → 2026-02-19T14:30 3.0h · 6p €171
Charged
86.43 MWh
Grid Import
62.19 MWh
Curtailed
1.25 MWh
Avg Price
€-5/MWh
SOC
24.3% → 85.0%
Charge 22.9 MW from grid @ โ‚ฌ-9/MWh
DISCHARGE 2026-02-19T15:00 → 2026-02-19T15:00 0.5h · 1p €975
Discharged
7.12 MWh
Grid Export
12.37 MWh
Curtailed
1.25 MWh
Avg Price
€54/MWh
SOC
78.5% → 78.5%
Discharge 14.2 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-19T15:30 → 2026-02-19T15:30 0.5h · 1p €9
Charged
7.91 MWh
Grid Import
2.16 MWh
Curtailed
1.25 MWh
Avg Price
€35/MWh
SOC
85.0% → 85.0%
Charge 15.8 MW from renewables @ โ‚ฌ35/MWh | Curtail 2.5 MW demand
DISCHARGE 2026-02-19T16:00 → 2026-02-19T16:30 1.0h · 2p €1,638
Discharged
7.17 MWh
Grid Export
18.81 MWh
Curtailed
2.45 MWh
Avg Price
€64/MWh
SOC
81.7% → 78.5%
Discharge 7.3 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand
IDLE 2026-02-19T17:00 → 2026-02-19T17:00 0.5h · 1p €521
Grid Export
5.22 MWh
Curtailed
1.3 MWh
Avg Price
€52/MWh
SOC
78.5% → 78.5%
Curtail 2.6 MW demand | Export 10.4 MW surplus
DISCHARGE 2026-02-19T17:30 → 2026-02-19T19:30 2.5h · 5p €9,279
Discharged
61.66 MWh
Grid Export
89.91 MWh
Curtailed
6.25 MWh
Avg Price
€96/MWh
SOC
77.0% → 21.5%
Discharge 3.3 MW to grid @ โ‚ฌ74/MWh | Curtail 2.5 MW demand
IDLE 2026-02-19T20:00 → 2026-02-20T00:00 4.5h · 9p €3,608
Grid Export
46.2 MWh
Curtailed
6.15 MWh
Avg Price
€40/MWh
SOC
21.5% → 21.5%
Curtail 2.5 MW demand | Export 10.7 MW surplus
CHARGE 2026-02-20T00:30 → 2026-02-20T00:30 0.5h · 1p €-242
Charged
15.0 MWh
Grid Import
9.79 MWh
Avg Price
€20/MWh
SOC
33.6% → 33.6%
Charge 30.0 MW from grid @ โ‚ฌ20/MWh
IDLE 2026-02-20T01:00 → 2026-02-20T01:00 0.5h · 1p €403
Grid Export
5.47 MWh
Avg Price
€36/MWh
SOC
33.6% → 33.6%
Export 10.9 MW surplus
CHARGE 2026-02-20T01:30 → 2026-02-20T01:30 0.5h · 1p €-76
Charged
10.38 MWh
Grid Import
4.91 MWh
Avg Price
€22/MWh
SOC
42.1% → 42.1%
Charge 20.8 MW from grid @ โ‚ฌ22/MWh
IDLE 2026-02-20T02:00 → 2026-02-20T03:30 2.0h · 4p €1,165
Grid Export
20.58 MWh
Avg Price
€28/MWh
SOC
42.1% → 42.1%
Export 9.4 MW surplus
CHARGE 2026-02-20T04:00 → 2026-02-20T05:00 1.5h · 3p €-644
Charged
45.0 MWh
Grid Import
28.62 MWh
Avg Price
€18/MWh
SOC
54.2% → 78.5%
Charge 30.0 MW from grid @ โ‚ฌ20/MWh
IDLE 2026-02-20T05:30 → 2026-02-20T08:00 3.0h · 6p €2,160
Grid Export
27.22 MWh
Curtailed
6.1 MWh
Avg Price
€39/MWh
SOC
78.5% → 78.5%
Export 9.7 MW surplus
DISCHARGE 2026-02-20T08:30 → 2026-02-20T11:30 3.5h · 7p €5,821
Discharged
69.01 MWh
Grid Export
96.22 MWh
Curtailed
8.7 MWh
Avg Price
€54/MWh
SOC
71.7% → 15.0%
Discharge 15.0 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-20T12:00 → 2026-02-20T14:30 3.0h · 6p €270
Charged
86.43 MWh
Grid Import
62.66 MWh
Avg Price
€-7/MWh
SOC
24.3% → 85.0%
Charge 22.9 MW from grid @ โ‚ฌ-8/MWh
DISCHARGE 2026-02-20T15:00 → 2026-02-20T15:00 0.5h · 1p €1,189
Discharged
7.12 MWh
Grid Export
13.9 MWh
Curtailed
1.25 MWh
Avg Price
€59/MWh
SOC
78.5% → 78.5%
Discharge 14.2 MW to grid @ โ‚ฌ59/MWh | Curtail 2.5 MW demand
IDLE 2026-02-20T15:30 → 2026-02-20T15:30 0.5h · 1p €597
Grid Export
7.93 MWh
Curtailed
1.25 MWh
Avg Price
€48/MWh
SOC
78.5% → 78.5%
Curtail 2.5 MW demand | Export 15.9 MW surplus
DISCHARGE 2026-02-20T16:00 → 2026-02-20T16:00 0.5h · 1p €1,034
Discharged
8.76 MWh
Grid Export
15.82 MWh
Curtailed
1.25 MWh
Avg Price
€58/MWh
SOC
70.5% → 70.5%
Discharge 17.5 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand
IDLE 2026-02-20T16:30 → 2026-02-20T17:30 1.5h · 3p €1,637
Grid Export
21.21 MWh
Curtailed
3.7 MWh
Avg Price
€51/MWh
SOC
70.5% → 70.5%
Curtail 2.5 MW demand | Export 14.9 MW surplus
DISCHARGE 2026-02-20T18:00 → 2026-02-20T19:30 2.0h · 4p €8,526
Discharged
60.0 MWh
Grid Export
85.89 MWh
Curtailed
4.95 MWh
Avg Price
€98/MWh
SOC
56.6% → 15.0%
Discharge 30.0 MW to grid @ โ‚ฌ103/MWh | Curtail 2.5 MW demand
OFFLINE 2026-02-20T20:00 → 2026-02-21T00:30 5.0h · 10p €2,714
Grid Export
62.29 MWh
Curtailed
6.05 MWh
Avg Price
€40/MWh
SOC
15.0% → 15.0%
Curtail 2.4 MW demand | Export 13.1 MW surplus
CHARGE 2026-02-21T01:00 → 2026-02-21T01:00 0.5h · 1p €38
Charged
7.88 MWh
Grid Import
2.94 MWh
Avg Price
€27/MWh
SOC
21.5% → 21.5%
Charge 15.8 MW from grid @ โ‚ฌ27/MWh
IDLE 2026-02-21T01:30 → 2026-02-21T02:00 1.0h · 2p €564
Grid Export
7.16 MWh
Avg Price
€33/MWh
SOC
21.5% → 21.5%
Export 7.7 MW surplus
CHARGE 2026-02-21T02:30 → 2026-02-21T03:30 1.5h · 3p €-753
Charged
42.71 MWh
Grid Import
30.33 MWh
Avg Price
€22/MWh
SOC
31.8% → 56.2%
Charge 25.4 MW from grid @ โ‚ฌ30/MWh
IDLE 2026-02-21T04:00 → 2026-02-21T07:30 4.0h · 8p €2,012
Grid Export
23.46 MWh
Curtailed
4.85 MWh
Avg Price
€34/MWh
SOC
56.2% → 56.2%
Export 6.3 MW surplus
DISCHARGE 2026-02-21T08:00 → 2026-02-21T08:30 1.0h · 2p €1,611
Discharged
17.4 MWh
Grid Export
25.17 MWh
Curtailed
2.5 MWh
Avg Price
€54/MWh
SOC
49.3% → 40.2%
Discharge 15.0 MW to grid @ โ‚ฌ55/MWh | Curtail 2.5 MW demand
IDLE 2026-02-21T09:00 → 2026-02-21T09:30 1.0h · 2p €764
Grid Export
9.46 MWh
Curtailed
2.45 MWh
Avg Price
€42/MWh
SOC
40.2% → 40.2%
Curtail 2.4 MW demand | Export 9.3 MW surplus
DISCHARGE 2026-02-21T10:00 → 2026-02-21T10:00 0.5h · 1p €793
Discharged
7.5 MWh
Grid Export
12.41 MWh
Curtailed
1.25 MWh
Avg Price
€52/MWh
SOC
33.4% → 33.4%
Discharge 15.0 MW to grid @ โ‚ฌ52/MWh | Curtail 2.5 MW demand
IDLE 2026-02-21T10:30 → 2026-02-21T10:30 0.5h · 1p €425
Grid Export
4.76 MWh
Curtailed
1.3 MWh
Avg Price
€45/MWh
SOC
33.4% → 33.4%
Curtail 2.6 MW demand | Export 9.5 MW surplus
DISCHARGE 2026-02-21T11:00 → 2026-02-21T11:30 1.0h · 2p €1,789
Discharged
19.95 MWh
Grid Export
29.97 MWh
Curtailed
2.5 MWh
Avg Price
€54/MWh
SOC
28.9% → 15.0%
Discharge 9.9 MW to grid @ โ‚ฌ50/MWh | Curtail 2.5 MW demand
CHARGE 2026-02-21T12:00 → 2026-02-21T14:30 3.0h · 6p €249
Charged
86.28 MWh
Grid Import
64.66 MWh
Avg Price
€-6/MWh
SOC
24.2% → 85.0%
Charge 22.6 MW from grid @ โ‚ฌ-6/MWh
DISCHARGE 2026-02-21T15:00 → 2026-02-21T15:00 0.5h · 1p €898
Discharged
7.11 MWh
Grid Export
13.07 MWh
Curtailed
1.25 MWh
Avg Price
€46/MWh
SOC
78.5% → 78.5%
Discharge 14.2 MW to grid @ โ‚ฌ46/MWh | Curtail 2.5 MW demand
IDLE 2026-02-21T15:30 → 2026-02-21T16:30 1.5h · 3p €1,344
Discharged
0.01 MWh
Grid Export
16.73 MWh
Curtailed
3.75 MWh
Avg Price
€48/MWh
SOC
78.5% → 78.5%
Curtail 2.5 MW demand | Export 10.1 MW surplus
DISCHARGE 2026-02-21T17:00 → 2026-02-21T17:00 0.5h · 1p €677
Discharged
1.53 MWh
Grid Export
7.42 MWh
Curtailed
1.25 MWh
Avg Price
€62/MWh
SOC
77.1% → 77.1%
Discharge 3.1 MW to grid @ โ‚ฌ62/MWh | Curtail 2.5 MW demand
IDLE 2026-02-21T17:30 → 2026-02-21T17:30 0.5h · 1p €476
Grid Export
4.96 MWh
Curtailed
1.25 MWh
Avg Price
€53/MWh
SOC
77.1% → 77.1%
Curtail 2.5 MW demand | Export 9.9 MW surplus
DISCHARGE 2026-02-21T18:00 → 2026-02-21T19:30 2.0h · 4p €7,456
Discharged
60.0 MWh
Grid Export
80.66 MWh
Curtailed
4.95 MWh
Avg Price
€92/MWh
SOC
63.2% → 21.5%
Discharge 30.0 MW to grid @ โ‚ฌ98/MWh | Curtail 2.5 MW demand
IDLE 2026-02-21T20:00 → 2026-02-21T21:30 2.0h · 4p €2,218
Grid Export
24.37 MWh
Curtailed
4.9 MWh
Avg Price
€52/MWh
SOC
21.5% → 21.5%
Curtail 2.4 MW demand | Export 11.6 MW surplus
DISCHARGE 2026-02-21T22:00 → 2026-02-21T22:00 0.5h · 1p €710
Discharged
7.12 MWh
Grid Export
14.38 MWh
Curtailed
1.15 MWh
Avg Price
€45/MWh
SOC
15.0% → 15.0%
Discharge 14.2 MW to grid @ โ‚ฌ45/MWh | Curtail 2.3 MW demand
CHARGE 2026-02-21T22:30 → 2026-02-21T22:30 0.5h · 1p €93
Charged
7.91 MWh
Grid Import
3.07 MWh
Avg Price
€15/MWh
SOC
21.5% → 21.5%
Charge 15.8 MW from grid @ โ‚ฌ15/MWh
IDLE 2026-02-21T23:00 → 2026-02-21T23:00 0.5h · 1p €325
Grid Export
5.57 MWh
Avg Price
€27/MWh
SOC
21.5% → 21.5%
Export 11.1 MW surplus
DISCHARGE 2026-02-21T23:30 → 2026-02-21T23:30 0.5h · 1p €423
Discharged
7.12 MWh
Grid Export
13.88 MWh
Avg Price
€29/MWh
SOC
15.0% → 15.0%
Discharge 14.2 MW to grid @ โ‚ฌ29/MWh
Time (Europe/Bucharest)โ“˜ Actionโ“˜ Gen MWโ“˜ Dem MWโ“˜ Curt MWโ“˜ Priceโ“˜ Chg MWโ“˜ Dis MWโ“˜ SOC%โ“˜ Grid Inโ“˜ Grid Outโ“˜ FCR MWโ“˜ FFR MWโ“˜ Imp €โ“˜ Exp €โ“˜ Batt €โ“˜ Anc €โ“˜ Net €โ“˜ Signalโ“˜
2026-02-15 03:30Charge 15.0 MW from grid @ โ‚ฌ32/MWh 22.2815.670.032.45 15.00.031.1% 8.860.0 15.0 0.0 143.790.0 -243.37 109.8 -55.75 CHARGE
2026-02-15 04:00Charge 30.0 MW from grid @ โ‚ฌ6/MWh 19.6315.620.06.2 30.00.043.3% 26.460.0 0.0 0.0 82.020.0 -93.0 0.0 -125.44 CHARGE
2026-02-15 04:30Charge 30.0 MW from grid @ โ‚ฌ20/MWh 18.6515.650.019.77 30.00.055.4% 27.470.0 0.0 0.0 271.530.0 -296.55 0.0 -314.95 CHARGE
2026-02-15 05:00Export 1.9 MW surplus 18.8716.50.033.41 0.00.055.4% 0.01.87 15.0 15.0 0.031.27 0.0 207.22 238.41 IDLE
2026-02-15 05:30Export 4.1 MW surplus 20.816.260.032.06 0.00.055.4% 0.04.05 15.0 15.0 0.064.96 0.0 130.05 194.92 IDLE
2026-02-15 06:00Charge 30.0 MW from grid @ โ‚ฌ28/MWh | Curtail 2.3 MW demand 19.5915.142.328.03 30.00.067.5% 23.70.0 0.0 0.0 332.20.0 -420.45 0.0 -359.5 CHARGE
2026-02-15 06:30Curtail 2.5 MW demand | Export 5.9 MW surplus 20.3516.452.534.96 0.00.067.5% 0.05.91 15.0 15.0 0.0103.25 0.0 157.65 282.66 IDLE
2026-02-15 07:00Charge 27.3 MW from grid @ โ‚ฌ30/MWh | Curtail 2.4 MW demand 22.0816.262.430.26 27.260.078.5% 19.520.0 2.74 0.0 295.40.0 -412.38 18.01 -298.68 CHARGE
2026-02-15 07:30Curtail 2.5 MW demand | Export 6.2 MW surplus 20.9116.732.547.18 0.00.078.5% 0.06.18 15.0 15.0 0.0145.74 0.0 260.02 435.16 IDLE
2026-02-15 08:00Discharge 30.0 MW to grid @ โ‚ฌ67/MWh | Curtail 2.5 MW demand 21.5116.862.567.47 0.030.064.7% 0.036.64 0.0 0.0 0.01236.19 1012.05 0.0 1234.94 DISCHARGE
2026-02-15 08:30Discharge 15.0 MW to grid @ โ‚ฌ57/MWh | Curtail 2.5 MW demand 20.7816.492.556.58 0.015.057.8% 0.021.29 15.0 0.0 0.0602.32 424.35 126.15 742.08 DISCHARGE
2026-02-15 09:00Discharge 30.0 MW to grid @ โ‚ฌ65/MWh | Curtail 2.5 MW demand 20.516.872.565.23 0.030.044.0% 0.035.62 0.0 0.0 0.01161.8 978.45 0.0 1159.15 DISCHARGE
2026-02-15 09:30Discharge 9.3 MW to grid @ โ‚ฌ55/MWh | Curtail 2.5 MW demand 20.016.522.555.03 0.09.2639.8% 0.014.74 15.0 5.74 0.0405.69 254.79 169.92 596.54 DISCHARGE
2026-02-15 10:00Discharge 9.9 MW to grid @ โ‚ฌ55/MWh | Curtail 2.5 MW demand 19.5216.442.554.99 0.09.935.3% 0.014.99 15.0 5.1 0.0412.06 272.2 99.73 531.77 DISCHARGE
2026-02-15 10:30Discharge 30.0 MW to grid @ โ‚ฌ61/MWh | Curtail 2.5 MW demand 21.8816.392.560.57 0.030.021.5% 0.037.5 0.0 0.0 0.01135.63 908.55 0.0 1130.06 DISCHARGE
2026-02-15 11:00Curtail 2.5 MW demand | Export 8.7 MW surplus 23.4816.782.548.34 0.00.021.5% 0.08.7 15.0 15.0 0.0210.2 0.0 210.15 450.47 IDLE
2026-02-15 11:30Discharge 14.2 MW to grid @ โ‚ฌ43/MWh | Curtail 2.5 MW demand 24.4116.372.543.34 0.014.2515.0% 0.024.3 0.0 15.0 0.0526.62 308.78 59.1 592.13 DISCHARGE
2026-02-15 12:00Charge 23.2 MW from grid @ โ‚ฌ-3/MWh 25.0716.620.0-2.96 23.170.024.4% 15.220.0 6.83 0.0 -22.530.0 34.29 105.55 94.52 CHARGE
2026-02-15 12:30Charge 30.0 MW from grid @ โ‚ฌ-4/MWh 22.6816.40.0-4.23 30.00.036.5% 24.210.0 0.0 0.0 -51.210.0 63.45 0.0 7.79 CHARGE
2026-02-15 13:00Charge 30.0 MW from grid @ โ‚ฌ-6/MWh 23.7316.420.0-5.58 30.00.048.7% 23.180.0 0.0 0.0 -64.670.0 83.7 0.0 21.26 CHARGE
2026-02-15 13:30Charge 30.0 MW from grid @ โ‚ฌ-5/MWh 25.1416.680.0-5.04 30.00.060.8% 22.040.0 0.0 0.0 -55.540.0 75.6 0.0 12.12 CHARGE
2026-02-15 14:00Charge 30.0 MW from grid @ โ‚ฌ-8/MWh 24.2814.950.0-8.42 30.00.072.9% 21.120.0 0.0 0.0 -88.910.0 126.3 0.0 45.49 CHARGE
2026-02-15 14:30Charge 30.0 MW from grid @ โ‚ฌ-10/MWh 23.3816.430.0-10.24 30.00.085.0% 23.540.0 0.0 0.0 -120.520.0 153.6 0.0 77.1 CHARGE
2026-02-15 15:00Discharge 8.0 MW to grid @ โ‚ฌ51/MWh | Curtail 2.5 MW demand 25.9716.692.551.05 0.08.0181.4% 0.019.29 8.39 13.6 0.0492.43 204.52 341.36 854.04 DISCHARGE
2026-02-15 15:30Curtail 2.5 MW demand | Export 13.0 MW surplus 27.7816.772.537.83 0.00.081.4% 0.013.01 8.4 15.0 0.0246.03 0.0 134.91 404.49 IDLE
2026-02-15 16:00Discharge 9.9 MW to grid @ โ‚ฌ64/MWh | Curtail 2.5 MW demand 26.9216.612.563.51 0.09.976.9% 0.022.21 15.0 5.1 0.0705.35 314.37 223.46 954.12 DISCHARGE
2026-02-15 16:30Curtail 2.5 MW demand | Export 11.6 MW surplus 26.0116.392.547.98 0.00.076.9% 0.011.63 15.0 15.0 0.0278.96 0.0 238.05 546.91 IDLE
2026-02-15 17:00Curtail 2.5 MW demand | Export 10.5 MW surplus 24.9316.412.552.94 0.00.076.9% 0.010.53 15.0 15.0 0.0278.78 0.0 161.85 473.63 IDLE
2026-02-15 17:30Curtail 2.5 MW demand | Export 12.1 MW surplus 26.6316.512.554.08 0.00.076.9% 0.012.13 15.0 15.0 0.0327.9 0.0 148.8 510.41 IDLE
2026-02-15 18:00Discharge 30.0 MW to grid @ โ‚ฌ94/MWh | Curtail 2.5 MW demand 25.0816.552.594.04 0.030.063.0% 0.040.53 0.0 0.0 0.01905.89 1410.6 0.0 1921.24 DISCHARGE
2026-02-15 18:30Discharge 30.0 MW to grid @ โ‚ฌ100/MWh | Curtail 2.4 MW demand 22.8216.332.4100.46 0.030.049.2% 0.038.4 0.0 0.0 0.01928.64 1506.9 0.0 1945.49 DISCHARGE
2026-02-15 19:00Discharge 30.0 MW to grid @ โ‚ฌ87/MWh | Curtail 2.5 MW demand 21.8916.622.586.78 0.030.035.3% 0.037.27 0.0 0.0 0.01617.27 1301.7 0.0 1628.08 DISCHARGE
2026-02-15 19:30Discharge 30.0 MW to grid @ โ‚ฌ93/MWh | Curtail 2.5 MW demand 22.7916.512.592.51 0.030.021.5% 0.038.29 0.0 0.0 0.01771.06 1387.65 0.0 1785.46 DISCHARGE
2026-02-15 20:00Curtail 2.4 MW demand | Export 8.6 MW surplus 22.9116.212.460.18 0.00.021.5% 0.08.62 15.0 15.0 0.0259.31 0.0 336.45 631.78 IDLE
2026-02-15 20:30Curtail 2.5 MW demand | Export 9.7 MW surplus 24.016.342.550.69 0.00.021.5% 0.09.67 15.0 15.0 0.0245.08 0.0 180.9 457.57 IDLE
2026-02-15 21:00Curtail 2.5 MW demand | Export 9.1 MW surplus 23.516.412.555.08 0.00.021.5% 0.09.1 15.0 15.0 0.0250.55 0.0 174.75 459.64 IDLE
2026-02-15 21:30Curtail 2.5 MW demand | Export 6.9 MW surplus 21.4216.492.540.62 0.00.021.5% 0.06.93 15.0 15.0 0.0140.81 0.0 206.55 372.66 IDLE
2026-02-15 22:00Curtail 2.3 MW demand | Export 10.5 MW surplus 23.9115.262.328.95 0.00.021.5% 0.010.49 15.0 15.0 0.0151.87 0.0 176.77 345.2 IDLE
2026-02-15 22:30Charge 30.0 MW from grid @ โ‚ฌ18/MWh 22.9715.540.018.33 30.00.033.6% 23.040.0 0.0 0.0 211.130.0 -274.95 0.0 -254.55 CHARGE
2026-02-15 23:00Charge 30.0 MW from grid @ โ‚ฌ23/MWh 21.515.370.023.13 30.00.045.7% 24.330.0 0.0 0.0 281.350.0 -346.95 0.0 -324.76 CHARGE
2026-02-15 23:30Export 7.3 MW surplus 23.2715.530.045.05 0.00.045.7% 0.07.27 15.0 15.0 0.0163.85 0.0 265.95 429.71 IDLE
2026-02-16 00:00Export 7.1 MW surplus 22.9715.450.038.29 0.00.045.7% 0.07.06 15.0 15.0 0.0135.1 0.0 155.02 290.03 IDLE
2026-02-16 00:30Export 7.0 MW surplus 23.0115.550.027.26 0.00.045.7% 0.06.99 15.0 15.0 0.095.32 0.0 163.5 258.73 IDLE
2026-02-16 01:00Export 7.5 MW surplus 23.5915.590.038.44 0.00.045.7% 0.07.53 15.0 15.0 0.0144.77 0.0 189.9 334.58 IDLE
2026-02-16 01:30Export 7.8 MW surplus 23.9515.680.025.68 0.00.045.7% 0.07.8 15.0 15.0 0.0100.13 0.0 198.52 298.56 IDLE
2026-02-16 02:00Charge 30.0 MW from grid @ โ‚ฌ25/MWh 24.0315.50.025.1 30.00.057.8% 21.940.0 0.0 0.0 275.290.0 -376.5 0.0 -318.71 CHARGE
2026-02-16 02:30Export 9.7 MW surplus 25.9715.750.027.2 0.00.057.8% 0.09.75 15.0 15.0 0.0132.57 0.0 110.85 243.33 IDLE
2026-02-16 03:00Charge 20.9 MW from grid @ โ‚ฌ26/MWh 23.6515.640.025.93 20.880.066.3% 13.340.0 9.12 0.0 172.990.0 -270.72 39.9 -163.34 CHARGE
2026-02-16 03:30Charge 30.0 MW from grid @ โ‚ฌ25/MWh 24.6115.390.025.29 30.00.078.5% 21.240.0 0.0 0.0 268.60.0 -379.35 0.0 -312.02 CHARGE
2026-02-16 04:00Export 7.5 MW surplus 23.7915.830.034.8 0.00.078.5% 0.07.49 15.0 15.0 0.0130.24 0.0 181.95 312.1 IDLE
2026-02-16 04:30Export 9.2 MW surplus 25.2215.550.027.85 0.00.078.5% 0.09.2 15.0 15.0 0.0128.16 0.0 183.38 311.44 IDLE
2026-02-16 05:00Export 8.5 MW surplus 25.3516.360.031.79 0.00.078.5% 0.08.5 15.0 15.0 0.0135.09 0.0 132.0 267.0 IDLE
2026-02-16 05:30Export 7.4 MW surplus 24.6616.780.038.22 0.00.078.5% 0.07.38 15.0 15.0 0.0140.97 0.0 147.38 288.25 IDLE
2026-02-16 06:00Curtail 2.3 MW demand | Export 11.9 MW surplus 25.3415.292.337.92 0.00.078.5% 0.011.89 15.0 15.0 0.0225.46 0.0 129.68 376.85 IDLE
2026-02-16 06:30Curtail 2.5 MW demand | Export 11.7 MW surplus 26.2216.492.532.61 0.00.078.5% 0.011.74 15.0 15.0 0.0191.34 0.0 139.65 351.29 IDLE
2026-02-16 07:00Curtail 2.5 MW demand | Export 12.4 MW surplus 26.816.412.534.13 0.00.078.5% 0.012.4 15.0 15.0 0.0211.57 0.0 122.25 355.06 IDLE
2026-02-16 07:30Discharge 14.0 MW to grid @ โ‚ฌ49/MWh | Curtail 2.5 MW demand 24.9416.472.548.84 0.014.0472.1% 0.024.51 15.0 0.96 0.0598.55 342.84 165.21 773.91 DISCHARGE
2026-02-16 08:00Discharge 30.0 MW to grid @ โ‚ฌ51/MWh | Curtail 2.5 MW demand 25.1616.622.550.8 0.030.058.3% 0.040.54 0.0 0.0 0.01029.75 762.0 0.0 1018.08 DISCHARGE
2026-02-16 08:30Discharge 30.0 MW to grid @ โ‚ฌ52/MWh | Curtail 2.5 MW demand 25.1216.722.551.56 0.030.044.4% 0.040.4 0.0 0.0 0.01041.6 773.4 0.0 1030.4 DISCHARGE
2026-02-16 09:00Discharge 19.8 MW to grid @ โ‚ฌ50/MWh | Curtail 2.5 MW demand 24.7216.62.549.79 0.019.835.3% 0.029.93 10.2 0.0 0.0745.0 492.92 58.45 805.87 DISCHARGE
2026-02-16 09:30Discharge 30.0 MW to grid @ โ‚ฌ67/MWh | Curtail 2.5 MW demand 25.8416.522.566.94 0.030.021.5% 0.041.32 0.0 0.0 0.01383.13 1004.1 0.0 1381.5 DISCHARGE
2026-02-16 10:00Curtail 2.5 MW demand | Export 8.1 MW surplus 22.8916.752.538.49 0.00.021.5% 0.08.13 15.0 15.0 0.0156.53 0.0 284.25 464.75 IDLE
2026-02-16 10:30Curtail 2.5 MW demand | Export 9.4 MW surplus 23.8716.452.532.82 0.00.021.5% 0.09.42 15.0 15.0 0.0154.62 0.0 173.7 348.74 IDLE
2026-02-16 11:00Curtail 2.5 MW demand | Export 9.2 MW surplus 23.9316.682.548.03 0.00.021.5% 0.09.25 15.0 15.0 0.0222.13 0.0 241.65 493.71 IDLE
2026-02-16 11:30Discharge 14.2 MW to grid @ โ‚ฌ42/MWh | Curtail 2.5 MW demand 23.1516.452.542.02 0.014.2515.0% 0.022.96 0.0 15.0 0.0482.3 299.38 58.28 546.17 DISCHARGE
2026-02-16 12:00Charge 23.0 MW from grid @ โ‚ฌ-2/MWh 22.4816.570.0-2.46 23.020.024.4% 17.610.0 6.98 0.0 -21.660.0 28.31 99.44 87.75 CHARGE
2026-02-16 12:30Charge 30.0 MW from grid @ โ‚ฌ-3/MWh 22.4116.480.0-2.57 30.00.036.5% 24.560.0 0.0 0.0 -31.570.0 38.55 0.0 -11.86 CHARGE
2026-02-16 13:00Charge 30.0 MW from grid @ โ‚ฌ1/MWh | Curtail 2.5 MW demand 18.9416.492.50.55 30.00.048.6% 25.540.0 0.0 0.0 7.020.0 -8.25 0.0 -50.11 CHARGE
2026-02-16 13:30Charge 30.0 MW from grid @ โ‚ฌ-8/MWh 17.7116.440.0-7.77 30.00.060.7% 29.230.0 0.0 0.0 -113.550.0 116.55 0.0 70.12 CHARGE
2026-02-16 14:00Charge 30.0 MW from grid @ โ‚ฌ-3/MWh 17.8115.190.0-2.58 30.00.072.9% 27.840.0 0.0 0.0 -35.910.0 38.7 0.0 -7.52 CHARGE
2026-02-16 14:30Charge 30.0 MW from grid @ โ‚ฌ-6/MWh 18.8716.380.0-5.99 30.00.085.0% 28.00.0 0.0 0.0 -83.860.0 89.85 0.0 40.44 CHARGE
2026-02-16 15:00Discharge 7.3 MW to grid @ โ‚ฌ51/MWh | Curtail 2.5 MW demand 18.016.372.550.86 0.07.3381.7% 0.010.97 7.67 15.0 0.0278.92 186.32 338.07 638.11 DISCHARGE
2026-02-16 15:30Discharge 10.4 MW to grid @ โ‚ฌ63/MWh | Curtail 2.5 MW demand 18.3116.862.563.15 0.010.4477.0% 0.013.88 15.0 4.56 0.0438.25 329.66 169.22 631.76 DISCHARGE
2026-02-16 16:00Curtail 2.5 MW demand | Export 5.4 MW surplus 20.0216.672.556.82 0.00.077.0% 0.05.35 15.0 15.0 0.0152.12 0.0 152.1 339.64 IDLE
2026-02-16 16:30Curtail 2.4 MW demand | Export 7.3 MW surplus 21.5216.092.452.07 0.00.077.0% 0.07.34 15.0 15.0 0.0191.16 0.0 149.25 371.57 IDLE
2026-02-16 17:00Curtail 2.5 MW demand | Export 7.9 MW surplus 22.2616.42.548.57 0.00.077.0% 0.07.87 15.0 15.0 0.0191.19 0.0 153.6 375.06 IDLE
2026-02-16 17:30Curtail 2.4 MW demand | Export 8.0 MW surplus 22.2716.192.456.45 0.00.076.9% 0.07.99 15.0 15.0 0.0225.64 0.0 181.58 440.99 IDLE
2026-02-16 18:00Discharge 30.0 MW to grid @ โ‚ฌ107/MWh | Curtail 2.5 MW demand 22.9516.342.5106.54 0.030.063.1% 0.038.62 0.0 0.0 0.02057.28 1598.1 0.0 2080.44 DISCHARGE
2026-02-16 18:30Discharge 30.0 MW to grid @ โ‚ฌ95/MWh | Curtail 2.4 MW demand 22.8215.972.495.48 0.030.049.2% 0.038.77 0.0 0.0 0.01850.92 1432.2 0.0 1864.79 DISCHARGE
2026-02-16 19:00Discharge 30.0 MW to grid @ โ‚ฌ96/MWh | Curtail 2.5 MW demand 22.016.482.595.88 0.030.035.4% 0.037.53 0.0 0.0 0.01799.1 1438.2 0.0 1815.6 DISCHARGE
2026-02-16 19:30Discharge 30.0 MW to grid @ โ‚ฌ111/MWh | Curtail 2.4 MW demand 23.0316.312.4111.14 0.030.021.5% 0.038.63 0.0 0.0 0.02146.56 1667.1 0.0 2169.82 DISCHARGE
2026-02-16 20:00Curtail 2.5 MW demand | Export 8.1 MW surplus 22.5916.512.551.75 0.00.021.5% 0.08.09 15.0 15.0 0.0209.21 0.0 495.45 736.91 IDLE
2026-02-16 20:30Curtail 2.4 MW demand | Export 10.0 MW surplus 24.3516.222.458.14 0.00.021.5% 0.010.04 15.0 15.0 0.0291.96 0.0 178.95 505.71 IDLE
2026-02-16 21:00Curtail 2.5 MW demand | Export 9.1 MW surplus 23.6416.512.551.66 0.00.021.5% 0.09.13 15.0 15.0 0.0235.92 0.0 192.82 460.94 IDLE
2026-02-16 21:30Curtail 2.5 MW demand | Export 10.5 MW surplus 24.8816.432.550.38 0.00.021.5% 0.010.46 15.0 15.0 0.0263.41 0.0 141.98 436.79 IDLE
2026-02-16 22:00Curtail 2.3 MW demand | Export 13.0 MW surplus 26.3415.212.335.08 0.00.021.5% 0.012.97 15.0 15.0 0.0227.56 0.0 219.0 466.64 IDLE
2026-02-16 22:30Export 10.3 MW surplus 26.4915.710.043.79 0.00.021.5% 0.010.31 15.0 15.0 0.0225.72 0.0 207.45 433.08 IDLE
2026-02-16 23:00Export 9.3 MW surplus 25.3915.620.034.05 0.00.021.5% 0.09.3 15.0 15.0 0.0158.41 0.0 162.67 320.99 IDLE
2026-02-16 23:30Export 9.9 MW surplus 25.7715.450.029.7 0.00.021.5% 0.09.86 15.0 15.0 0.0146.38 0.0 141.66 287.96 IDLE
2026-02-17 00:00Charge 30.0 MW from grid @ โ‚ฌ20/MWh 26.9815.80.020.39 30.00.033.6% 19.290.0 0.0 0.0 196.70.0 -305.85 0.0 -240.13 CHARGE
2026-02-17 00:30Export 11.7 MW surplus 27.4115.270.028.55 0.00.033.6% 0.011.68 15.0 15.0 0.0166.74 0.0 172.42 339.08 IDLE
2026-02-17 01:00Charge 30.0 MW from grid @ โ‚ฌ10/MWh 26.5215.290.09.72 30.00.045.7% 19.230.0 0.0 0.0 93.450.0 -145.8 0.0 -136.88 CHARGE
2026-02-17 01:30Export 8.9 MW surplus 24.8115.490.025.51 0.00.045.7% 0.08.86 15.0 15.0 0.0112.95 0.0 205.95 318.81 IDLE
2026-02-17 02:00Charge 20.9 MW from grid @ โ‚ฌ25/MWh 25.9415.840.025.36 20.90.054.3% 11.280.0 9.1 0.0 143.040.0 -265.06 47.94 -125.39 CHARGE
2026-02-17 02:30Charge 30.0 MW from grid @ โ‚ฌ17/MWh 25.3515.470.017.25 30.00.066.4% 20.590.0 0.0 0.0 177.570.0 -258.75 0.0 -220.99 CHARGE
2026-02-17 03:00Charge 30.0 MW from grid @ โ‚ฌ20/MWh 24.9115.470.020.3 30.00.078.5% 21.020.0 0.0 0.0 213.380.0 -304.5 0.0 -256.81 CHARGE
2026-02-17 03:30Export 11.1 MW surplus 26.8815.280.032.47 0.00.078.5% 0.011.14 15.0 15.0 0.0180.94 0.0 157.2 338.05 IDLE
2026-02-17 04:00Export 10.3 MW surplus 26.3815.640.028.41 0.00.078.5% 0.010.27 15.0 15.0 0.0145.95 0.0 126.45 272.31 IDLE
2026-02-17 04:30Export 9.4 MW surplus 25.4715.640.027.51 0.00.078.5% 0.09.36 15.0 15.0 0.0128.72 0.0 126.9 255.53 IDLE
2026-02-17 05:00Export 8.1 MW surplus 25.1916.630.028.94 0.00.078.5% 0.08.06 15.0 15.0 0.0116.64 0.0 116.02 232.58 IDLE
2026-02-17 05:30Export 8.6 MW surplus 25.5116.390.031.65 0.00.078.5% 0.08.63 15.0 15.0 0.0136.54 0.0 141.82 278.28 IDLE
2026-02-17 06:00Curtail 2.2 MW demand | Export 11.0 MW surplus 24.1514.92.243.9 0.00.078.5% 0.011.0 15.0 15.0 0.0241.52 0.0 191.25 456.82 IDLE
2026-02-17 06:30Curtail 2.4 MW demand | Export 9.6 MW surplus 23.9516.282.440.26 0.00.078.5% 0.09.58 15.0 15.0 0.0192.88 0.0 124.12 341.07 IDLE
2026-02-17 07:00Curtail 2.5 MW demand | Export 9.8 MW surplus 24.3316.512.533.39 0.00.078.5% 0.09.82 15.0 15.0 0.0164.02 0.0 145.43 330.23 IDLE
2026-02-17 07:30Discharge 30.0 MW to grid @ โ‚ฌ59/MWh | Curtail 2.4 MW demand 25.2816.322.459.21 0.030.064.6% 0.040.88 0.0 0.0 0.01210.11 888.15 0.0 1202.22 DISCHARGE
2026-02-17 08:00Discharge 30.0 MW to grid @ โ‚ฌ55/MWh | Curtail 2.4 MW demand 25.5416.32.454.59 0.030.050.8% 0.041.15 0.0 0.0 0.01123.14 818.85 0.0 1112.47 DISCHARGE
2026-02-17 08:30Curtail 2.5 MW demand | Export 11.1 MW surplus 25.5216.432.546.83 0.00.050.8% 0.011.1 15.0 15.0 0.0259.84 0.0 170.85 459.87 IDLE
2026-02-17 09:00Curtail 2.5 MW demand | Export 11.3 MW surplus 25.7416.422.541.13 0.00.050.8% 0.011.32 15.0 15.0 0.0232.88 0.0 151.5 409.99 IDLE
2026-02-17 09:30Discharge 19.8 MW to grid @ โ‚ฌ52/MWh | Curtail 2.5 MW demand 25.516.412.551.62 0.019.841.7% 0.030.9 10.2 0.0 0.0797.5 511.04 79.56 880.63 DISCHARGE
2026-02-17 10:00Discharge 14.0 MW to grid @ โ‚ฌ47/MWh | Curtail 2.5 MW demand 24.9916.582.546.98 0.014.0335.3% 0.024.45 15.0 0.97 0.0574.25 329.66 112.02 695.27 DISCHARGE
2026-02-17 10:30Discharge 30.0 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand 24.8216.512.557.77 0.030.021.5% 0.040.31 0.0 0.0 0.01164.49 866.55 0.0 1157.17 DISCHARGE
2026-02-17 11:00Curtail 2.5 MW demand | Export 11.8 MW surplus 26.2716.452.543.28 0.00.021.5% 0.011.83 15.0 15.0 0.0255.93 0.0 221.02 503.91 IDLE
2026-02-17 11:30Discharge 14.2 MW to grid @ โ‚ฌ39/MWh | Curtail 2.5 MW demand 26.3716.532.538.79 0.014.2515.0% 0.026.09 0.0 15.0 0.0506.08 276.37 53.18 562.83 DISCHARGE
2026-02-17 12:00Charge 23.0 MW from grid @ โ‚ฌ-1/MWh 26.1316.330.0-0.83 23.020.024.4% 13.710.0 6.98 0.0 -5.690.0 9.55 87.32 59.67 CHARGE
2026-02-17 12:30Charge 30.0 MW from grid @ โ‚ฌ-1/MWh 26.7616.520.0-1.42 30.00.036.5% 20.250.0 0.0 0.0 -14.380.0 21.3 0.0 -29.05 CHARGE
2026-02-17 13:00Charge 30.0 MW from grid @ โ‚ฌ-4/MWh 26.3116.530.0-4.26 30.00.048.6% 20.720.0 0.0 0.0 -44.120.0 63.9 0.0 0.7 CHARGE
2026-02-17 13:30Charge 30.0 MW from grid @ โ‚ฌ-6/MWh 24.9616.240.0-6.19 30.00.060.7% 21.770.0 0.0 0.0 -67.370.0 92.85 0.0 23.94 CHARGE
2026-02-17 14:00Charge 30.0 MW from grid @ โ‚ฌ-2/MWh 23.3415.140.0-1.64 30.00.072.9% 22.250.0 0.0 0.0 -18.250.0 24.6 0.0 -25.18 CHARGE
2026-02-17 14:30Charge 30.0 MW from grid @ โ‚ฌ-3/MWh 23.6316.350.0-2.74 30.00.085.0% 23.210.0 0.0 0.0 -31.790.0 41.1 0.0 -11.63 CHARGE
2026-02-17 15:00Discharge 14.2 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand 24.0316.522.553.62 0.014.2478.5% 0.023.75 14.99 0.78 0.0636.74 381.66 304.5 954.1 DISCHARGE
2026-02-17 15:30Curtail 2.5 MW demand | Export 10.2 MW surplus 24.8516.72.552.18 0.00.078.5% 0.010.15 15.0 15.0 0.0264.92 0.1 144.28 441.72 IDLE
2026-02-17 16:00Curtail 2.5 MW demand | Export 10.6 MW surplus 25.2416.662.548.95 0.00.078.5% 0.010.58 15.0 15.0 0.0258.85 0.0 145.43 434.78 IDLE
2026-02-17 16:30Discharge 12.7 MW to grid @ โ‚ฌ62/MWh | Curtail 2.5 MW demand 24.6216.512.561.93 0.012.6672.8% 0.022.77 15.0 2.34 0.0705.02 391.86 152.54 877.9 DISCHARGE
2026-02-17 17:00Charge 27.2 MW from grid @ โ‚ฌ38/MWh | Curtail 2.5 MW demand 25.3716.442.538.25 27.170.083.8% 16.230.0 2.83 0.0 310.490.0 -519.66 31.68 -294.24 CHARGE
2026-02-17 17:30Discharge 15.0 MW to grid @ โ‚ฌ75/MWh | Curtail 2.5 MW demand 24.6316.662.574.76 0.015.076.9% 0.024.97 15.0 0.0 0.0933.37 560.7 235.2 1193.53 DISCHARGE
2026-02-17 18:00Discharge 30.0 MW to grid @ โ‚ฌ85/MWh | Curtail 2.5 MW demand 23.2716.612.585.2 0.030.063.1% 0.038.66 0.0 0.0 0.01647.02 1278.0 0.0 1656.85 DISCHARGE
2026-02-17 18:30Discharge 30.0 MW to grid @ โ‚ฌ101/MWh | Curtail 2.5 MW demand 25.9816.392.5100.58 0.030.049.2% 0.041.6 0.0 0.0 0.02092.11 1508.7 0.0 2111.55 DISCHARGE
2026-02-17 19:00Discharge 30.0 MW to grid @ โ‚ฌ107/MWh | Curtail 2.5 MW demand 26.7716.362.5106.65 0.030.035.4% 0.042.42 0.0 0.0 0.02262.22 1599.75 0.0 2285.45 DISCHARGE
2026-02-17 19:30Discharge 30.0 MW to grid @ โ‚ฌ93/MWh | Curtail 2.4 MW demand 25.8816.152.492.73 0.030.021.5% 0.041.65 0.0 0.0 0.01930.92 1390.95 0.0 1943.13 DISCHARGE
2026-02-17 20:00Curtail 2.5 MW demand | Export 13.1 MW surplus 27.6116.532.561.84 0.00.021.5% 0.013.08 15.0 15.0 0.0404.56 0.0 333.3 776.42 IDLE
2026-02-17 20:30Curtail 2.5 MW demand | Export 13.7 MW surplus 28.1916.492.544.6 0.00.021.5% 0.013.71 15.0 15.0 0.0305.63 0.0 232.65 566.06 IDLE
2026-02-17 21:00Curtail 2.5 MW demand | Export 13.2 MW surplus 27.8916.692.551.03 0.00.021.5% 0.013.2 15.0 15.0 0.0336.78 0.0 170.4 538.98 IDLE
2026-02-17 21:30Curtail 2.5 MW demand | Export 12.6 MW surplus 27.1116.562.542.35 0.00.021.5% 0.012.55 15.0 15.0 0.0265.81 0.0 182.48 474.67 IDLE
2026-02-17 22:00Curtail 2.3 MW demand | Export 14.3 MW surplus 27.615.192.334.47 0.00.021.5% 0.014.25 15.0 15.0 0.0245.67 0.0 182.77 448.18 IDLE
2026-02-17 22:30Export 12.0 MW surplus 27.8615.40.031.95 0.00.021.5% 0.012.0 15.0 15.0 0.0191.67 0.0 142.19 333.77 IDLE
2026-02-17 23:00Export 10.8 MW surplus 26.9115.670.033.05 0.00.021.5% 0.010.77 15.0 15.0 0.0177.97 0.0 122.92 300.8 IDLE
2026-02-17 23:30Export 12.3 MW surplus 28.2315.420.028.55 0.00.021.5% 0.012.35 15.0 15.0 0.0176.26 0.0 143.23 319.4 IDLE
2026-02-18 00:00Charge 30.0 MW from grid @ โ‚ฌ23/MWh 28.3615.620.023.23 30.00.033.6% 17.730.0 0.0 0.0 205.920.0 -348.45 0.0 -249.34 CHARGE
2026-02-18 00:30Export 12.8 MW surplus 28.5715.280.028.81 0.00.033.6% 0.012.83 15.0 15.0 0.0184.88 0.0 136.95 321.74 IDLE
2026-02-18 01:00Export 12.4 MW surplus 28.4315.540.033.41 0.00.033.6% 0.012.43 15.0 15.0 0.0207.59 0.0 154.5 362.0 IDLE
2026-02-18 01:30Charge 15.0 MW from renewables @ โ‚ฌ23/MWh 29.8915.20.022.61 15.00.039.8% 0.770.0 15.0 0.0 8.660.0 -169.58 112.35 81.93 CHARGE
2026-02-18 02:00Charge 30.0 MW from grid @ โ‚ฌ21/MWh 28.9415.460.020.72 30.00.051.9% 16.980.0 0.0 0.0 175.940.0 -310.8 0.0 -219.36 CHARGE
2026-02-18 02:30Export 13.6 MW surplus 29.6315.570.031.09 0.00.051.9% 0.013.6 15.0 15.0 0.0211.38 0.0 161.32 372.61 IDLE
2026-02-18 03:00Export 13.6 MW surplus 29.5215.420.026.57 0.00.051.9% 0.013.64 15.0 15.0 0.0181.17 0.0 121.28 302.36 IDLE
2026-02-18 03:30Export 13.5 MW surplus 29.2615.340.032.61 0.00.051.9% 0.013.46 15.0 15.0 0.0219.49 0.0 147.15 366.55 IDLE
2026-02-18 04:00Charge 20.4 MW from grid @ โ‚ฌ20/MWh 28.0315.630.020.46 20.450.060.2% 8.520.0 9.55 0.0 87.130.0 -209.19 77.03 -39.72 CHARGE
2026-02-18 04:30Charge 30.0 MW from grid @ โ‚ฌ14/MWh 28.0915.480.014.34 30.00.072.4% 17.850.0 0.0 0.0 128.020.0 -215.1 0.0 -171.44 CHARGE
2026-02-18 05:00Charge 15.0 MW from renewables @ โ‚ฌ23/MWh 30.2516.420.023.07 15.010.078.5% 1.670.0 14.99 0.0 19.270.0 -173.11 98.8 57.77 CHARGE
2026-02-18 05:30Export 10.6 MW surplus 27.6116.510.025.64 0.00.078.5% 0.010.6 15.0 15.0 0.0135.93 0.0 121.48 257.32 IDLE
2026-02-18 06:00Curtail 2.3 MW demand | Export 13.6 MW surplus 27.115.372.334.65 0.00.078.5% 0.013.57 15.0 15.0 0.0235.08 0.0 146.48 401.39 IDLE
2026-02-18 06:30Curtail 2.5 MW demand | Export 12.3 MW surplus 26.9816.72.534.94 0.00.078.5% 0.012.28 15.0 15.0 0.0214.5 0.0 142.58 378.83 IDLE
2026-02-18 07:00Curtail 2.5 MW demand | Export 14.2 MW surplus 28.8616.72.548.79 0.00.078.5% 0.014.16 15.0 15.0 0.0345.41 0.0 217.05 592.86 IDLE
2026-02-18 07:30Curtail 2.5 MW demand | Export 12.7 MW surplus 27.3116.572.545.78 0.00.078.5% 0.012.74 15.0 15.0 0.0291.65 0.0 146.7 466.87 IDLE
2026-02-18 08:00Discharge 19.8 MW to grid @ โ‚ฌ53/MWh | Curtail 2.5 MW demand 28.1216.532.553.05 0.019.869.5% 0.033.39 10.2 0.0 0.0885.78 525.19 81.4 971.64 DISCHARGE
2026-02-18 08:30Discharge 30.0 MW to grid @ โ‚ฌ52/MWh | Curtail 2.4 MW demand 27.7516.092.452.05 0.030.055.6% 0.043.58 0.0 0.0 0.01134.16 780.75 0.0 1121.97 DISCHARGE
2026-02-18 09:00Discharge 23.7 MW to grid @ โ‚ฌ51/MWh | Curtail 2.5 MW demand 29.1216.382.551.26 0.023.6744.7% 0.038.42 6.33 0.0 0.0984.74 606.69 35.03 1017.52 DISCHARGE
2026-02-18 09:30Discharge 15.0 MW to grid @ โ‚ฌ49/MWh | Curtail 2.5 MW demand 31.5716.422.548.68 0.015.037.9% 0.032.16 15.0 0.0 0.0782.71 365.1 96.3 887.68 DISCHARGE
2026-02-18 10:00Discharge 19.8 MW to grid @ โ‚ฌ51/MWh | Curtail 2.4 MW demand 29.4216.182.451.37 0.019.828.9% 0.034.96 10.2 0.0 0.0897.85 508.56 57.83 957.81 DISCHARGE
2026-02-18 10:30Curtail 2.4 MW demand | Export 15.1 MW surplus 29.4716.32.441.18 0.00.028.9% 0.015.08 15.0 15.0 0.0310.52 0.0 178.27 513.42 IDLE
2026-02-18 11:00Discharge 30.0 MW to grid @ โ‚ฌ56/MWh | Curtail 2.4 MW demand 30.0316.162.455.5 0.030.015.0% 0.045.79 0.0 0.0 0.01270.67 832.5 0.0 1260.55 DISCHARGE
2026-02-18 11:30Curtail 2.5 MW demand | Export 17.0 MW surplus 31.516.492.542.99 0.00.015.0% 0.017.02 0.0 15.0 0.0365.74 0.0 72.98 465.5 IDLE
2026-02-18 12:00Charge 22.8 MW from grid @ โ‚ฌ-7/MWh 30.9716.640.0-7.4 22.830.024.3% 9.00.0 7.17 0.0 -33.30.0 84.47 116.89 117.12 CHARGE
2026-02-18 12:30Charge 30.0 MW from grid @ โ‚ฌ-10/MWh 30.3816.690.0-9.65 30.00.036.5% 16.810.0 0.0 0.0 -81.110.0 144.75 0.0 37.68 CHARGE
2026-02-18 13:00Charge 30.0 MW from grid @ โ‚ฌ-6/MWh 30.0616.570.0-6.01 30.00.048.6% 17.010.0 0.0 0.0 -51.10.0 90.15 0.0 7.67 CHARGE
2026-02-18 13:30Charge 30.0 MW from grid @ โ‚ฌ0/MWh | Curtail 2.5 MW demand 30.6916.342.50.3 30.00.060.7% 13.640.0 0.0 0.0 2.050.0 -4.5 0.0 -45.29 CHARGE
2026-02-18 14:00Charge 30.0 MW from grid @ โ‚ฌ-1/MWh 31.3914.730.0-0.99 30.00.072.9% 13.780.0 0.0 0.0 -6.820.0 14.85 0.0 -36.61 CHARGE
2026-02-18 14:30Charge 30.0 MW from grid @ โ‚ฌ-9/MWh 30.5416.20.0-8.89 30.00.085.0% 16.150.0 0.0 0.0 -71.780.0 133.35 0.0 28.35 CHARGE
2026-02-18 15:00Discharge 14.2 MW to grid @ โ‚ฌ48/MWh | Curtail 2.4 MW demand 29.6316.282.447.79 0.014.2478.5% 0.029.5 14.99 0.77 0.0705.01 340.25 294.42 1007.44 DISCHARGE
2026-02-18 15:30Curtail 2.5 MW demand | Export 15.9 MW surplus 30.2216.352.535.51 0.00.078.5% 0.015.88 15.0 15.0 0.0281.94 0.0 197.74 501.79 IDLE
2026-02-18 16:00Curtail 2.5 MW demand | Export 13.5 MW surplus 28.016.472.553.31 0.00.078.5% 0.013.54 15.0 15.0 0.0360.91 0.0 245.32 639.47 IDLE
2026-02-18 16:30Curtail 2.4 MW demand | Export 12.4 MW surplus 26.8716.332.446.27 0.00.078.5% 0.012.45 15.0 15.0 0.0287.95 0.0 144.3 459.92 IDLE
2026-02-18 17:00Curtail 2.5 MW demand | Export 14.7 MW surplus 29.2816.562.550.43 0.00.078.5% 0.014.72 15.0 15.0 0.0371.25 0.0 124.73 527.4 IDLE
2026-02-18 17:30Curtail 2.5 MW demand | Export 13.5 MW surplus 27.9416.462.552.69 0.00.078.5% 0.013.49 15.0 15.0 0.0355.42 0.0 162.3 550.56 IDLE
2026-02-18 18:00Discharge 30.0 MW to grid @ โ‚ฌ101/MWh | Curtail 2.5 MW demand 31.5716.52.5101.02 0.030.064.6% 0.047.08 0.0 0.0 0.02377.76 1515.3 0.0 2397.46 DISCHARGE
2026-02-18 18:30Discharge 30.0 MW to grid @ โ‚ฌ88/MWh | Curtail 2.5 MW demand 31.4316.692.588.13 0.030.050.8% 0.046.74 0.0 0.0 0.02059.57 1321.95 0.0 2071.22 DISCHARGE
2026-02-18 19:00Discharge 30.0 MW to grid @ โ‚ฌ90/MWh | Curtail 2.4 MW demand 28.5516.32.490.19 0.030.036.9% 0.044.16 0.0 0.0 0.01991.52 1352.85 0.0 2002.2 DISCHARGE
2026-02-18 19:30Discharge 30.0 MW to grid @ โ‚ฌ98/MWh | Curtail 2.5 MW demand 30.7216.572.597.69 0.030.023.0% 0.046.16 0.0 0.0 0.02254.45 1465.35 0.0 2272.07 DISCHARGE
2026-02-18 20:00Discharge 3.3 MW to grid @ โ‚ฌ66/MWh | Curtail 2.5 MW demand 30.0316.52.565.93 0.03.3221.5% 0.018.86 15.0 11.68 0.0621.64 109.53 320.91 978.87 DISCHARGE
2026-02-18 20:30Curtail 2.5 MW demand | Export 15.3 MW surplus 29.7216.442.546.75 0.00.021.5% 0.015.29 15.0 15.0 0.0357.33 0.0 242.62 629.08 IDLE
2026-02-18 21:00Curtail 2.5 MW demand | Export 16.0 MW surplus 30.6216.652.534.07 0.00.021.5% 0.015.97 15.0 15.0 0.0272.06 0.0 180.08 473.34 IDLE
2026-02-18 21:30Curtail 2.5 MW demand | Export 15.4 MW surplus 30.0816.652.549.61 0.00.021.5% 0.015.44 15.0 15.0 0.0382.87 0.0 216.22 630.01 IDLE
2026-02-18 22:00Curtail 2.2 MW demand | Export 16.3 MW surplus 29.3814.872.224.67 0.00.021.5% 0.016.26 15.0 15.0 0.0200.62 0.0 228.0 442.09 IDLE
2026-02-18 22:30Export 11.7 MW surplus 27.6515.470.039.32 0.00.021.5% 0.011.71 15.0 15.0 0.0230.27 0.0 228.52 458.71 IDLE
2026-02-18 23:00Export 10.5 MW surplus 26.4715.540.029.73 0.00.021.5% 0.010.46 15.0 15.0 0.0155.54 0.0 156.15 311.6 IDLE
2026-02-18 23:30Export 10.6 MW surplus 26.4915.460.036.63 0.00.021.5% 0.010.57 15.0 15.0 0.0193.61 0.0 141.59 335.11 IDLE
2026-02-19 00:00Export 11.3 MW surplus 27.3715.590.036.61 0.00.021.5% 0.011.31 15.0 15.0 0.0207.08 0.0 121.57 328.55 IDLE
2026-02-19 00:30Charge 30.0 MW from grid @ โ‚ฌ18/MWh 27.1115.540.018.34 30.00.033.6% 18.90.0 0.0 0.0 173.280.0 -275.1 0.0 -216.71 CHARGE
2026-02-19 01:00Charge 30.0 MW from grid @ โ‚ฌ23/MWh 25.4915.770.022.84 30.00.045.8% 20.750.0 0.0 0.0 237.010.0 -342.6 0.0 -280.44 CHARGE
2026-02-19 01:30Export 11.0 MW surplus 26.7515.270.026.27 0.00.045.8% 0.011.02 15.0 15.0 0.0144.77 0.0 134.7 279.38 IDLE
2026-02-19 02:00Export 8.7 MW surplus 24.6315.480.037.56 0.00.045.8% 0.08.69 15.0 15.0 0.0163.14 0.0 177.08 340.13 IDLE
2026-02-19 02:30Export 8.1 MW surplus 23.9315.360.022.19 0.00.045.8% 0.08.11 15.0 15.0 0.089.95 0.0 198.08 287.93 IDLE
2026-02-19 03:00Charge 30.0 MW from grid @ โ‚ฌ23/MWh 23.3715.590.022.64 30.00.057.9% 22.690.0 0.0 0.0 256.820.0 -339.6 0.0 -300.26 CHARGE
2026-02-19 03:30Export 6.6 MW surplus 22.3715.260.030.15 0.00.057.9% 0.06.65 15.0 15.0 0.0100.21 0.0 141.75 241.87 IDLE
2026-02-19 04:00Export 7.0 MW surplus 22.9715.550.022.76 0.00.057.9% 0.06.95 15.0 15.0 0.079.13 0.0 146.85 225.89 IDLE
2026-02-19 04:30Export 7.0 MW surplus 22.9115.410.027.87 0.00.057.9% 0.07.04 15.0 15.0 0.098.07 0.0 144.68 242.66 IDLE
2026-02-19 05:00Charge 30.0 MW from grid @ โ‚ฌ16/MWh 22.3516.380.015.94 30.00.070.0% 24.520.0 0.0 0.0 195.450.0 -239.1 0.0 -238.89 CHARGE
2026-02-19 05:30Export 6.3 MW surplus 23.0116.250.046.5 0.00.070.0% 0.06.27 15.0 15.0 0.0145.84 0.0 332.92 478.67 IDLE
2026-02-19 06:00Curtail 2.2 MW demand | Export 10.6 MW surplus 23.7614.932.225.77 0.00.070.0% 0.010.58 15.0 15.0 0.0136.38 0.0 235.42 385.89 IDLE
2026-02-19 06:30Curtail 2.5 MW demand | Export 11.8 MW surplus 26.4816.682.537.15 0.00.070.0% 0.011.8 15.0 15.0 0.0219.18 0.0 197.85 440.16 IDLE
2026-02-19 07:00Curtail 2.5 MW demand | Export 10.0 MW surplus 24.4816.52.543.37 0.00.070.0% 0.09.99 15.0 15.0 0.0216.52 0.0 149.18 392.72 IDLE
2026-02-19 07:30Discharge 30.0 MW to grid @ โ‚ฌ61/MWh | Curtail 2.5 MW demand 24.7416.612.561.19 0.030.056.1% 0.040.13 0.0 0.0 0.01227.79 917.85 0.0 1222.6 DISCHARGE
2026-02-19 08:00Curtail 2.5 MW demand | Export 10.1 MW surplus 24.916.782.542.73 0.00.056.1% 0.010.12 15.0 15.0 0.0216.14 0.0 233.32 476.08 IDLE
2026-02-19 08:30Discharge 30.0 MW to grid @ โ‚ฌ65/MWh | Curtail 2.5 MW demand 23.6816.542.564.84 0.030.042.3% 0.039.15 0.0 0.0 0.01269.1 972.6 0.0 1266.19 DISCHARGE
2026-02-19 09:00Discharge 15.0 MW to grid @ โ‚ฌ55/MWh | Curtail 2.5 MW demand 24.2716.412.555.2 0.015.035.4% 0.024.86 15.0 0.0 0.0686.22 414.0 127.72 826.69 DISCHARGE
2026-02-19 09:30Discharge 15.0 MW to grid @ โ‚ฌ52/MWh | Curtail 2.5 MW demand 23.9116.582.551.77 0.015.028.6% 0.024.33 15.0 0.0 0.0629.78 388.27 85.88 726.25 DISCHARGE
2026-02-19 10:00Curtail 2.5 MW demand | Export 10.6 MW surplus 24.9616.412.540.91 0.00.028.6% 0.010.56 15.0 15.0 0.0215.96 0.0 175.58 417.01 IDLE
2026-02-19 10:30Curtail 2.5 MW demand | Export 9.2 MW surplus 23.5816.412.550.75 0.00.028.6% 0.09.17 15.0 15.0 0.0232.77 0.0 178.05 442.45 IDLE
2026-02-19 11:00Curtail 2.4 MW demand | Export 9.2 MW surplus 23.5216.242.440.64 0.00.028.6% 0.09.19 15.0 15.0 0.0186.8 0.0 210.68 421.77 IDLE
2026-02-19 11:30Discharge 29.4 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand 23.016.662.553.52 0.029.415.0% 0.037.74 0.0 0.6 0.01009.96 786.75 3.18 1004.03 DISCHARGE
2026-02-19 12:00Charge 22.9 MW from grid @ โ‚ฌ-9/MWh 23.1416.430.0-9.09 22.860.024.3% 16.650.0 7.14 0.0 -75.650.0 103.92 135.7 178.23 CHARGE
2026-02-19 12:30Charge 30.0 MW from grid @ โ‚ฌ-1/MWh 24.1416.530.0-0.54 30.00.036.5% 22.890.0 0.0 0.0 -6.180.0 8.1 0.0 -37.25 CHARGE
2026-02-19 13:00Charge 30.0 MW from grid @ โ‚ฌ-9/MWh 24.8416.320.0-8.97 30.00.048.6% 21.970.0 0.0 0.0 -98.540.0 134.55 0.0 55.1 CHARGE
2026-02-19 13:30Charge 30.0 MW from grid @ โ‚ฌ-3/MWh 23.7316.570.0-3.22 30.00.060.7% 23.340.0 0.0 0.0 -37.570.0 48.3 0.0 -5.86 CHARGE
2026-02-19 14:00Charge 30.0 MW from grid @ โ‚ฌ-7/MWh 24.8514.890.0-7.16 30.00.072.9% 20.490.0 0.0 0.0 -73.340.0 107.4 0.0 29.91 CHARGE
2026-02-19 14:30Charge 30.0 MW from grid @ โ‚ฌ1/MWh | Curtail 2.5 MW demand 25.4316.482.50.66 30.00.085.0% 19.040.0 0.0 0.0 6.280.0 -9.9 0.0 -49.3 CHARGE
2026-02-19 15:00Discharge 14.2 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand 25.1416.652.553.93 0.014.2578.5% 0.024.74 15.0 0.75 0.0667.15 384.16 294.51 974.69 DISCHARGE
2026-02-19 15:30Charge 15.8 MW from renewables @ โ‚ฌ35/MWh | Curtail 2.5 MW demand 26.1216.632.535.34 15.810.085.0% 4.320.0 0.0 14.19 76.340.0 -279.39 86.05 8.87 CHARGE
2026-02-19 16:00Discharge 7.3 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand 25.4716.52.557.58 0.07.3381.7% 0.018.31 7.67 15.0 0.0527.02 210.94 183.97 736.3 DISCHARGE
2026-02-19 16:30Discharge 7.0 MW to grid @ โ‚ฌ70/MWh | Curtail 2.4 MW demand 26.616.22.470.0 0.07.078.5% 0.019.31 15.0 8.0 0.0675.85 244.86 194.19 901.84 DISCHARGE
2026-02-19 17:00Curtail 2.6 MW demand | Export 10.4 MW surplus 25.3717.012.651.64 0.00.078.5% 0.010.45 15.0 15.0 0.0269.81 0.0 217.35 520.64 IDLE
2026-02-19 17:30Discharge 3.3 MW to grid @ โ‚ฌ74/MWh | Curtail 2.5 MW demand 25.1516.82.573.67 0.03.3377.0% 0.013.67 15.0 11.67 0.0503.7 122.61 267.34 812.19 DISCHARGE
2026-02-19 18:00Discharge 30.0 MW to grid @ โ‚ฌ101/MWh | Curtail 2.5 MW demand 25.6116.622.5100.59 0.030.063.1% 0.040.99 0.0 0.0 0.02061.42 1508.85 0.0 2080.86 DISCHARGE
2026-02-19 18:30Discharge 30.0 MW to grid @ โ‚ฌ103/MWh | Curtail 2.5 MW demand 26.2816.372.5102.85 0.030.049.2% 0.041.92 0.0 0.0 0.02155.58 1542.75 0.0 2176.43 DISCHARGE
2026-02-19 19:00Discharge 30.0 MW to grid @ โ‚ฌ106/MWh | Curtail 2.5 MW demand 25.8516.482.5105.99 0.030.035.4% 0.041.38 0.0 0.0 0.02192.83 1589.85 0.0 2215.64 DISCHARGE
2026-02-19 19:30Discharge 30.0 MW to grid @ โ‚ฌ95/MWh | Curtail 2.5 MW demand 26.2516.412.594.53 0.030.021.5% 0.041.85 0.0 0.0 0.01977.81 1417.95 0.0 1993.46 DISCHARGE
2026-02-19 20:00Curtail 2.5 MW demand | Export 10.7 MW surplus 25.4216.712.548.93 0.00.021.5% 0.010.71 15.0 15.0 0.0261.99 0.0 394.42 686.9 IDLE
2026-02-19 20:30Curtail 2.5 MW demand | Export 11.6 MW surplus 26.116.542.547.8 0.00.021.5% 0.011.56 15.0 15.0 0.0276.37 0.0 128.1 434.26 IDLE
2026-02-19 21:00Curtail 2.5 MW demand | Export 11.6 MW surplus 25.9716.372.553.35 0.00.021.5% 0.011.61 15.0 15.0 0.0309.67 0.0 185.25 528.17 IDLE
2026-02-19 21:30Curtail 2.5 MW demand | Export 11.2 MW surplus 25.6416.422.546.42 0.00.021.5% 0.011.23 15.0 15.0 0.0260.59 0.0 185.85 475.36 IDLE
2026-02-19 22:00Curtail 2.3 MW demand | Export 11.9 MW surplus 25.2515.162.336.49 0.00.021.5% 0.011.94 15.0 15.0 0.0217.76 0.0 162.08 400.72 IDLE
2026-02-19 22:30Export 9.0 MW surplus 25.1715.740.034.06 0.00.021.5% 0.08.96 15.0 15.0 0.0152.55 0.0 112.65 265.11 IDLE
2026-02-19 23:00Export 8.5 MW surplus 24.7215.730.035.76 0.00.021.5% 0.08.52 15.0 15.0 0.0152.3 0.0 133.26 285.48 IDLE
2026-02-19 23:30Export 9.3 MW surplus 25.3915.610.029.37 0.00.021.5% 0.09.31 15.0 15.0 0.0136.74 0.0 162.13 298.78 IDLE
2026-02-20 00:00Export 8.5 MW surplus 24.4715.460.028.42 0.00.021.5% 0.08.55 15.0 15.0 0.0121.45 0.0 112.1 233.46 IDLE
2026-02-20 00:30Charge 30.0 MW from grid @ โ‚ฌ20/MWh 25.8815.010.020.31 30.00.033.6% 19.580.0 0.0 0.0 198.850.0 -304.65 0.0 -242.28 CHARGE
2026-02-20 01:00Export 10.9 MW surplus 26.9415.540.035.82 0.00.033.6% 0.010.94 15.0 15.0 0.0195.89 0.0 207.15 402.95 IDLE
2026-02-20 01:30Charge 20.8 MW from grid @ โ‚ฌ22/MWh 26.9115.50.022.36 20.760.042.1% 9.820.0 9.24 0.0 109.770.0 -232.13 63.92 -75.93 CHARGE
2026-02-20 02:00Export 9.4 MW surplus 25.3815.520.034.7 0.00.042.1% 0.09.4 15.0 15.0 0.0163.07 0.0 208.8 371.78 IDLE
2026-02-20 02:30Export 10.2 MW surplus 26.1415.510.025.16 0.00.042.1% 0.010.16 15.0 15.0 0.0127.87 0.0 153.68 281.46 IDLE
2026-02-20 03:00Export 9.9 MW surplus 25.6815.30.028.21 0.00.042.1% 0.09.92 15.0 15.0 0.0139.97 0.0 119.18 259.06 IDLE
2026-02-20 03:30Export 11.7 MW surplus 27.7215.580.023.34 0.00.042.1% 0.011.67 15.0 15.0 0.0136.22 0.0 116.18 252.3 IDLE
2026-02-20 04:00Charge 30.0 MW from grid @ โ‚ฌ20/MWh 26.7315.590.019.69 30.00.054.2% 19.320.0 0.0 0.0 190.240.0 -295.35 0.0 -233.67 CHARGE
2026-02-20 04:30Charge 30.0 MW from grid @ โ‚ฌ15/MWh 27.3615.60.014.59 30.00.066.4% 18.70.0 0.0 0.0 136.440.0 -218.85 0.0 -179.87 CHARGE
2026-02-20 05:00Charge 30.0 MW from grid @ โ‚ฌ19/MWh 27.9416.660.019.41 30.00.078.5% 19.220.0 0.0 0.0 186.530.0 -291.15 0.0 -229.96 CHARGE
2026-02-20 05:30Export 9.7 MW surplus 26.7916.60.028.73 0.00.078.5% 0.09.69 15.0 15.0 0.0139.23 0.0 180.05 319.18 IDLE
2026-02-20 06:00Curtail 2.2 MW demand | Export 12.1 MW surplus 25.3314.942.236.68 0.00.078.5% 0.012.14 15.0 15.0 0.0222.74 0.0 151.65 394.47 IDLE
2026-02-20 06:30Curtail 2.5 MW demand | Export 10.1 MW surplus 24.616.492.546.47 0.00.078.5% 0.010.12 15.0 15.0 0.0235.03 0.0 204.82 468.81 IDLE
2026-02-20 07:00Curtail 2.5 MW demand | Export 9.2 MW surplus 23.7316.522.540.48 0.00.078.5% 0.09.21 15.0 15.0 0.0186.5 0.0 166.95 378.66 IDLE
2026-02-20 07:30Curtail 2.5 MW demand | Export 6.4 MW surplus 20.9516.522.541.63 0.00.078.5% 0.06.43 15.0 15.0 0.0133.93 0.0 111.38 271.24 IDLE
2026-02-20 08:00Curtail 2.5 MW demand | Export 6.9 MW surplus 21.5316.672.541.9 0.00.078.5% 0.06.86 15.0 15.0 0.0143.64 0.0 157.95 327.69 IDLE
2026-02-20 08:30Discharge 15.0 MW to grid @ โ‚ฌ54/MWh | Curtail 2.5 MW demand 23.9116.612.554.31 0.015.071.7% 0.024.3 15.0 0.0 0.0659.91 407.33 136.95 809.05 DISCHARGE
2026-02-20 09:00Discharge 30.0 MW to grid @ โ‚ฌ60/MWh | Curtail 2.5 MW demand 22.7516.852.559.58 0.030.057.8% 0.037.89 0.0 0.0 0.01128.73 893.7 0.0 1122.54 DISCHARGE
2026-02-20 09:30Discharge 30.0 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand 22.4416.882.557.71 0.030.043.9% 0.037.56 0.0 0.0 0.01083.74 865.65 0.0 1076.37 DISCHARGE
2026-02-20 10:00Discharge 15.0 MW to grid @ โ‚ฌ53/MWh | Curtail 2.5 MW demand 22.2116.512.552.77 0.015.037.1% 0.022.7 15.0 0.0 0.0599.06 395.78 123.38 733.66 DISCHARGE
2026-02-20 10:30Discharge 15.0 MW to grid @ โ‚ฌ51/MWh | Curtail 2.4 MW demand 21.8915.852.451.22 0.015.030.2% 0.022.96 15.0 0.0 0.0588.12 384.15 87.38 684.47 DISCHARGE
2026-02-20 11:00Discharge 30.0 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand 21.0316.712.557.58 0.030.016.4% 0.036.32 0.0 0.0 0.01045.62 863.7 0.0 1038.17 DISCHARGE
2026-02-20 11:30Discharge 3.0 MW to grid @ โ‚ฌ47/MWh | Curtail 2.5 MW demand 22.0916.412.546.97 0.03.0215.0% 0.010.71 0.0 15.0 0.0251.49 70.94 80.1 356.49 DISCHARGE
2026-02-20 12:00Charge 22.9 MW from grid @ โ‚ฌ-8/MWh 22.8416.360.0-7.7 22.860.024.3% 16.870.0 7.14 0.0 -64.960.0 88.03 119.53 151.37 CHARGE
2026-02-20 12:30Charge 30.0 MW from grid @ โ‚ฌ-1/MWh 21.9916.430.0-1.0 30.00.036.5% 24.930.0 0.0 0.0 -12.470.0 15.0 0.0 -30.96 CHARGE
2026-02-20 13:00Charge 30.0 MW from grid @ โ‚ฌ-4/MWh 22.3816.420.0-4.35 30.00.048.6% 24.530.0 0.0 0.0 -53.360.0 65.25 0.0 9.93 CHARGE
2026-02-20 13:30Charge 30.0 MW from grid @ โ‚ฌ-4/MWh 24.516.60.0-4.12 30.00.060.7% 22.60.0 0.0 0.0 -46.550.0 61.8 0.0 3.12 CHARGE
2026-02-20 14:00Charge 30.0 MW from grid @ โ‚ฌ-12/MWh 26.4314.780.0-11.9 30.00.072.9% 18.790.0 0.0 0.0 -111.820.0 178.5 0.0 68.39 CHARGE
2026-02-20 14:30Charge 30.0 MW from grid @ โ‚ฌ-13/MWh 29.2216.320.0-12.71 30.00.085.0% 17.590.0 0.0 0.0 -111.780.0 190.65 0.0 68.35 CHARGE
2026-02-20 15:00Discharge 14.2 MW to grid @ โ‚ฌ59/MWh | Curtail 2.5 MW demand 28.1116.562.558.95 0.014.2578.5% 0.027.8 15.0 0.75 0.0819.4 419.91 353.84 1189.41 DISCHARGE
2026-02-20 15:30Curtail 2.5 MW demand | Export 15.9 MW surplus 30.4716.612.548.37 0.00.078.5% 0.015.86 15.0 15.0 0.0383.67 0.0 182.7 596.51 IDLE
2026-02-20 16:00Discharge 17.5 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand 28.7416.612.558.39 0.017.5270.5% 0.031.65 12.48 0.0 0.0924.05 511.35 99.0 1034.15 DISCHARGE
2026-02-20 16:30Curtail 2.5 MW demand | Export 14.9 MW surplus 29.2816.372.549.42 0.00.070.5% 0.014.92 15.0 15.0 0.0368.65 0.0 176.32 575.77 IDLE
2026-02-20 17:00Curtail 2.4 MW demand | Export 14.0 MW surplus 28.4316.332.452.62 0.00.070.5% 0.014.01 15.0 15.0 0.0368.6 0.0 167.4 567.48 IDLE
2026-02-20 17:30Curtail 2.5 MW demand | Export 13.5 MW surplus 27.916.412.551.1 0.00.070.5% 0.013.5 15.0 15.0 0.0344.96 0.0 116.55 493.36 IDLE
2026-02-20 18:00Discharge 30.0 MW to grid @ โ‚ฌ103/MWh | Curtail 2.5 MW demand 27.7716.542.5103.36 0.030.056.6% 0.043.24 0.0 0.0 0.02234.47 1550.4 0.0 2255.64 DISCHARGE
2026-02-20 18:30Discharge 30.0 MW to grid @ โ‚ฌ93/MWh | Curtail 2.5 MW demand 26.9216.752.592.6 0.030.042.8% 0.042.17 0.0 0.0 0.01952.25 1389.0 0.0 1966.7 DISCHARGE
2026-02-20 19:00Discharge 30.0 MW to grid @ โ‚ฌ101/MWh | Curtail 2.4 MW demand 26.9216.152.4101.31 0.030.028.9% 0.042.69 0.0 0.0 0.02162.39 1519.65 0.0 2179.74 DISCHARGE
2026-02-20 19:30Discharge 30.0 MW to grid @ โ‚ฌ96/MWh | Curtail 2.5 MW demand 28.1416.462.596.45 0.030.015.0% 0.043.69 0.0 0.0 0.02106.77 1446.75 0.0 2123.62 DISCHARGE
2026-02-20 20:00Curtail 2.4 MW demand | Export 13.1 MW surplus 27.4216.272.456.07 0.00.015.0% 0.013.06 0.0 0.0 0.0366.12 0.0 0.0 399.67 OFFLINE
2026-02-20 20:30Curtail 2.4 MW demand | Export 13.6 MW surplus 27.9216.222.449.53 0.00.015.0% 0.013.61 0.0 0.0 0.0337.14 0.0 0.0 366.76 OFFLINE
2026-02-20 21:00Curtail 2.5 MW demand | Export 13.4 MW surplus 28.0816.662.564.24 0.00.015.0% 0.013.42 0.0 0.0 0.0431.07 0.0 0.0 471.13 OFFLINE
2026-02-20 21:30Curtail 2.5 MW demand | Export 14.0 MW surplus 28.5616.592.545.74 0.00.015.0% 0.013.97 0.0 0.0 0.0319.5 0.0 0.0 347.99 OFFLINE
2026-02-20 22:00Curtail 2.3 MW demand | Export 14.2 MW surplus 27.3915.062.340.54 0.00.015.0% 0.014.18 0.0 0.0 0.0287.39 0.0 0.0 310.61 OFFLINE
2026-02-20 22:30Export 11.7 MW surplus 27.8515.640.029.59 0.00.015.0% 0.011.74 0.0 0.0 0.0173.71 0.0 0.0 173.62 OFFLINE
2026-02-20 23:00Export 11.5 MW surplus 27.4415.430.037.37 0.00.015.0% 0.011.55 0.0 0.0 0.0215.76 0.0 0.0 215.67 OFFLINE
2026-02-20 23:30Export 11.3 MW surplus 27.1915.440.038.9 0.00.015.0% 0.011.28 0.0 0.0 0.0219.48 0.0 0.0 219.39 OFFLINE
2026-02-21 00:00Export 10.8 MW surplus 27.1115.830.028.26 0.00.015.0% 0.010.81 0.0 0.0 0.0152.71 0.0 0.0 152.62 OFFLINE
2026-02-21 00:30Export 10.9 MW surplus 26.8715.460.010.32 0.00.015.0% 0.010.95 0.0 0.0 0.056.49 0.0 0.0 56.4 OFFLINE
2026-02-21 01:00Charge 15.8 MW from grid @ โ‚ฌ27/MWh 25.9415.610.026.93 15.750.021.5% 5.890.0 14.25 0.0 79.350.0 -212.13 140.18 37.98 CHARGE
2026-02-21 01:30Export 7.7 MW surplus 23.6715.50.035.41 0.00.021.5% 0.07.71 15.0 15.0 0.0136.46 0.0 162.07 298.45 IDLE
2026-02-21 02:00Export 6.6 MW surplus 22.2915.220.030.49 0.00.021.5% 0.06.61 15.0 15.0 0.0100.78 0.0 164.4 265.09 IDLE
2026-02-21 02:30Charge 25.4 MW from grid @ โ‚ฌ30/MWh 24.2215.190.029.92 25.420.031.8% 16.840.0 4.58 0.0 251.960.0 -380.28 24.96 -263.81 CHARGE
2026-02-21 03:00Charge 30.0 MW from grid @ โ‚ฌ15/MWh 24.7615.410.014.74 30.00.044.0% 21.110.0 0.0 0.0 155.60.0 -221.1 0.0 -199.03 CHARGE
2026-02-21 03:30Charge 30.0 MW from grid @ โ‚ฌ22/MWh 23.4315.660.021.76 30.00.056.2% 22.70.0 0.0 0.0 246.970.0 -326.4 0.0 -290.41 CHARGE
2026-02-21 04:00Export 6.3 MW surplus 22.415.620.029.68 0.00.056.2% 0.06.31 15.0 15.0 0.093.64 0.0 157.72 251.27 IDLE
2026-02-21 04:30Export 5.5 MW surplus 21.6315.640.029.67 0.00.056.2% 0.05.52 15.0 15.0 0.081.9 0.0 117.6 199.41 IDLE
2026-02-21 05:00Export 3.1 MW surplus 19.9516.330.035.3 0.00.056.2% 0.03.13 15.0 15.0 0.055.19 0.0 136.65 191.75 IDLE
2026-02-21 05:30Export 4.0 MW surplus 21.2816.770.029.99 0.00.056.2% 0.04.01 15.0 15.0 0.060.08 0.0 138.0 197.99 IDLE
2026-02-21 06:00Curtail 2.2 MW demand | Export 7.2 MW surplus 20.2914.862.238.04 0.00.056.2% 0.07.18 15.0 15.0 0.0136.64 0.0 175.8 333.28 IDLE
2026-02-21 06:30Curtail 2.5 MW demand | Export 7.1 MW surplus 21.6416.542.539.51 0.00.056.2% 0.07.1 15.0 15.0 0.0140.34 0.0 125.25 290.19 IDLE
2026-02-21 07:00Curtail 2.5 MW demand | Export 6.1 MW surplus 20.6316.52.536.69 0.00.056.2% 0.06.14 15.0 15.0 0.0112.57 0.0 136.2 271.61 IDLE
2026-02-21 07:30Curtail 2.5 MW demand | Export 7.5 MW surplus 21.9916.472.532.01 0.00.056.2% 0.07.53 15.0 15.0 0.0120.45 0.0 135.9 276.27 IDLE
2026-02-21 08:00Discharge 15.0 MW to grid @ โ‚ฌ55/MWh | Curtail 2.5 MW demand 21.8616.732.555.02 0.015.049.3% 0.022.13 15.0 0.0 0.0608.74 412.65 190.58 811.94 DISCHARGE
2026-02-21 08:30Discharge 19.8 MW to grid @ โ‚ฌ52/MWh | Curtail 2.5 MW demand 22.7916.382.552.17 0.019.840.2% 0.028.22 10.2 0.0 0.0736.08 516.48 59.06 799.05 DISCHARGE
2026-02-21 09:00Curtail 2.4 MW demand | Export 9.3 MW surplus 23.6816.272.445.57 0.00.040.2% 0.09.32 15.0 15.0 0.0212.4 0.0 147.45 387.1 IDLE
2026-02-21 09:30Curtail 2.5 MW demand | Export 9.6 MW surplus 24.0816.52.537.52 0.00.040.2% 0.09.59 15.0 15.0 0.0179.81 0.0 173.7 376.87 IDLE
2026-02-21 10:00Discharge 15.0 MW to grid @ โ‚ฌ52/MWh | Curtail 2.5 MW demand 24.2516.432.552.21 0.015.033.4% 0.024.82 15.0 0.0 0.0648.0 391.58 133.88 792.74 DISCHARGE
2026-02-21 10:30Curtail 2.6 MW demand | Export 9.5 MW surplus 24.517.072.644.89 0.00.033.4% 0.09.52 15.0 15.0 0.0213.63 0.0 182.18 424.89 IDLE
2026-02-21 11:00Discharge 9.9 MW to grid @ โ‚ฌ50/MWh | Curtail 2.5 MW demand 25.0116.622.549.6 0.09.928.9% 0.020.29 15.0 5.1 0.0503.22 245.52 132.82 652.65 DISCHARGE
2026-02-21 11:30Discharge 30.0 MW to grid @ โ‚ฌ58/MWh | Curtail 2.5 MW demand 24.0816.432.557.7 0.030.015.0% 0.039.65 0.0 0.0 0.01144.03 865.5 0.0 1136.65 DISCHARGE
2026-02-21 12:00Charge 22.6 MW from grid @ โ‚ฌ-6/MWh 24.0516.320.0-5.77 22.560.024.2% 15.320.0 7.44 0.0 -44.20.0 65.08 132.3 143.81 CHARGE
2026-02-21 12:30Charge 30.0 MW from grid @ โ‚ฌ-4/MWh 23.416.180.0-4.14 30.00.036.4% 23.260.0 0.0 0.0 -48.150.0 62.1 0.0 4.72 CHARGE
2026-02-21 13:00Charge 30.0 MW from grid @ โ‚ฌ-9/MWh 23.6916.330.0-8.94 30.00.048.5% 23.130.0 0.0 0.0 -103.390.0 134.1 0.0 59.96 CHARGE
2026-02-21 13:30Charge 30.0 MW from grid @ โ‚ฌ-9/MWh 23.416.520.0-8.81 30.00.060.7% 23.620.0 0.0 0.0 -104.030.0 132.15 0.0 60.59 CHARGE
2026-02-21 14:00Charge 30.0 MW from grid @ โ‚ฌ-3/MWh 23.9515.20.0-3.03 30.00.072.8% 21.710.0 0.0 0.0 -32.880.0 45.45 0.0 -10.55 CHARGE
2026-02-21 14:30Charge 30.0 MW from grid @ โ‚ฌ-3/MWh 24.9116.690.0-3.03 30.00.085.0% 22.280.0 0.0 0.0 -33.750.0 45.45 0.0 -9.69 CHARGE
2026-02-21 15:00Discharge 14.2 MW to grid @ โ‚ฌ46/MWh | Curtail 2.5 MW demand 26.4716.542.546.42 0.014.2278.5% 0.026.15 14.97 0.81 0.0607.05 330.07 282.76 898.18 DISCHARGE
2026-02-21 15:30Curtail 2.5 MW demand | Export 10.1 MW surplus 24.5116.452.547.13 0.00.0178.5% 0.010.08 14.99 15.0 0.0237.52 0.27 151.65 418.53 IDLE
2026-02-21 16:00Curtail 2.5 MW demand | Export 11.9 MW surplus 26.4216.552.548.75 0.00.078.5% 0.011.88 15.0 15.0 0.0289.51 0.09 150.2 470.08 IDLE
2026-02-21 16:30Curtail 2.5 MW demand | Export 11.5 MW surplus 25.916.412.549.41 0.00.078.5% 0.011.5 15.0 15.0 0.0284.05 0.0 140.48 455.31 IDLE
2026-02-21 17:00Discharge 3.1 MW to grid @ โ‚ฌ62/MWh | Curtail 2.5 MW demand 26.5816.792.562.14 0.03.0677.1% 0.014.85 15.0 11.94 0.0461.37 95.17 181.0 676.7 DISCHARGE
2026-02-21 17:30Curtail 2.5 MW demand | Export 9.9 MW surplus 24.416.472.552.92 0.00.077.1% 0.09.93 15.0 15.0 0.0262.82 0.0 180.68 476.48 IDLE
2026-02-21 18:00Discharge 30.0 MW to grid @ โ‚ฌ98/MWh | Curtail 2.5 MW demand 25.0416.492.598.12 0.030.063.2% 0.040.56 0.0 0.0 0.01989.72 1471.8 0.0 2007.61 DISCHARGE
2026-02-21 18:30Discharge 30.0 MW to grid @ โ‚ฌ98/MWh | Curtail 2.4 MW demand 24.7216.122.497.96 0.030.049.3% 0.040.51 0.0 0.0 0.01984.32 1469.4 0.0 1999.66 DISCHARGE
2026-02-21 19:00Discharge 30.0 MW to grid @ โ‚ฌ84/MWh | Curtail 2.5 MW demand 24.2516.472.583.77 0.030.035.4% 0.039.79 0.0 0.0 0.01666.62 1256.55 0.0 1675.54 DISCHARGE
2026-02-21 19:30Discharge 30.0 MW to grid @ โ‚ฌ87/MWh | Curtail 2.5 MW demand 25.0916.642.587.13 0.030.021.5% 0.040.45 0.0 0.0 0.01762.24 1306.95 0.0 1773.26 DISCHARGE
2026-02-21 20:00Curtail 2.4 MW demand | Export 11.6 MW surplus 26.0316.322.457.73 0.00.021.5% 0.011.62 15.0 15.0 0.0335.53 0.0 326.85 696.92 IDLE
2026-02-21 20:30Curtail 2.5 MW demand | Export 11.4 MW surplus 25.7916.372.556.29 0.00.021.5% 0.011.43 15.0 15.0 0.0321.59 0.0 152.4 509.08 IDLE
2026-02-21 21:00Curtail 2.5 MW demand | Export 12.9 MW surplus 27.4916.632.557.16 0.00.021.5% 0.012.86 15.0 15.0 0.0367.57 0.0 134.48 537.68 IDLE
2026-02-21 21:30Curtail 2.4 MW demand | Export 12.8 MW surplus 27.1716.252.436.45 0.00.021.5% 0.012.83 15.0 15.0 0.0233.87 0.0 218.47 474.12 IDLE
2026-02-21 22:00Discharge 14.2 MW to grid @ โ‚ฌ45/MWh | Curtail 2.3 MW demand 27.8315.152.344.67 0.014.2515.0% 0.028.77 0.0 15.0 0.0642.58 318.24 62.77 710.36 DISCHARGE
2026-02-21 22:30Charge 15.8 MW from grid @ โ‚ฌ15/MWh 25.5515.420.014.84 15.810.021.5% 6.140.0 14.19 0.0 45.570.0 -117.31 161.63 93.12 CHARGE
2026-02-21 23:00Export 11.1 MW surplus 27.0515.440.027.02 0.00.021.5% 0.011.14 15.0 15.0 0.0150.54 0.0 174.52 324.97 IDLE
2026-02-21 23:30Discharge 14.2 MW to grid @ โ‚ฌ29/MWh 29.2915.330.029.19 0.014.2515.0% 0.027.75 0.0 15.0 0.0405.0 207.97 38.25 422.57 DISCHARGE
TOTALS 2185.5 1944.6 1501.0 4560.0 4475 137226 63863 34919 168194